Assessment Year | 1982 |
---|---|
Principal Product | STEEL VESSELS & FITTINGS |
NAICS |
n/a
|
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
n/a
|
Annual Production | 4,000
ton
|
Production Hrs. Annual | 5,720
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $209,296 | 4,342,028 |
kWh
|
$0.048 |
Natural Gas | $240,742 | 95,197 |
MMBtu
|
$2.53 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $119,300 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,430 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $54,065 | $36,000 |
$54,065
1,122,216
kWh
|
- | |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $30,995 | $59,000 | - |
$30,995
-
MMBtu
|
|
03 | 2.6212: Turn off equipment during breaks, reduce operating time | $24,810 | - |
$24,810
514,947
kWh
|
- | |
04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,265 | $535 | - |
$1,265
-
MMBtu
|
|
05 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $8,165 | $22,000 | - |
$8,165
-
MMBtu
|
|
TOTAL RECOMMENDED | $119,300 | $117,535 |
$78,875
1,637,163
kWh
|
$40,425
-
MMBtu
|
||
TOTAL IMPLEMENTED | $9,430 | $22,535 | - |
$9,430
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs