ITAC Assessment: KU0035
ITAC logo
ITAC Assessment: KU0035
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product STEEL VESSELS & FITTINGS
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 4,000
ton
Production Hrs. Annual 5,720
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $209,296 4,342,028
kWh
Natural Gas $240,742 95,197
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $119,300 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,430

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $54,065 $36,000 $54,065
1,122,216
kWh
-
02 2.2414: Use waste heat from hot flue gases to preheat $30,995 $59,000 - $30,995
-
MMBtu
03 2.6212: Turn off equipment during breaks, reduce operating time $24,810 - $24,810
514,947
kWh
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $1,265 $535 - $1,265
-
MMBtu
05 2.1131: Repair faulty insulation in furnaces, boilers, etc $8,165 $22,000 - $8,165
-
MMBtu
TOTAL RECOMMENDED $119,300 $117,535 $78,875
1,637,163
kWh
$40,425
-
MMBtu
TOTAL IMPLEMENTED $9,430 $22,535 - $9,430
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs