Assessment Year | 2004 |
---|---|
Principal Product | Salsa |
NAICS | 311422: Specialty Canning |
SIC | 2032: Canned Specialties |
Sales Range | $50 M to 100M |
# of Employees | 218 |
Plant Area |
243,000
ft2
|
Annual Production | 61,526,980
lb
|
Production Hrs. Annual | 3,526
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $271,676 | 2,645,253 |
kWh
|
$0.10 |
Electricity Demand | $99,033 | 8,472 |
kW-mo/yr
|
$11.69 |
Electricity Fees | $16,104 | - |
|
- |
Natural Gas | $252,818 | 40,507 |
MMBtu
|
$6.24 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $823,027 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $547,740 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Water Consumption Savings | Primary Product Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $12,800 | $1,220 |
$9,775
89,702
kWh
|
$3,025
-
kW-mo/yr
|
- | - | - | - | - | - | |
02 | 3.4154: Eliminate leaks in water lines and valves | $5,717 | $400 | - | - |
$1,424
-
MMBtu
|
$830
-
Tgal
|
- |
$3,463
-
Tgal
|
- | - | |
03 | 2.2135: Repair and eliminate steam leaks | $4,064 | $264 | - | - |
$4,064
-
MMBtu
|
- | - | - | - | - | |
04 | 2.2136: Install / repair insulation on steam lines | $5,504 | $1,585 | - | - |
$5,504
-
MMBtu
|
- | - | - | - | - | |
05 | 2.4133: Use most efficient type of electric motors | $238 | $142 |
$175
1,603
kWh
|
$63
-
kW-mo/yr
|
- | - | - | - | - | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,731 | - |
$3,474
31,875
kWh
|
$1,257
-
kW-mo/yr
|
- | - | - | - | - | - | |
07 | 4.441: Install automatic packing equipment | $182,520 | $80,000 | - | - | - | - | $182,520 | - | - | - | |
08 | 4.323: Optimize lot sizes to reduce inventory carrying costs | $150,678 | $1,000 | - | - |
$678
-
MMBtu
|
- | - | - | $150,000 | - | |
09 | 4.431: Train operators for maximum operating efficiency | $78,000 | $2,372 | - | - | - | - | $78,000 | - | - | - | |
10 | 4.122: Develop standard procedures to improve internal yields | $298,998 | $56,840 | - | - |
$3,998
-
MMBtu
|
- | - | - | $295,000 | - | |
11 | 4.611: Begin a practice of predictive / preventative maintenance | $69,741 | $2,000 | - | - |
$(-4,467.0)
-
MMBtu
|
- | $(-60,000.0) | - | - | $134,208 | |
12 | 2.7124: Make a practice of turning off lights when not needed | $10,036 | $4,988 |
$6,248
57,358
kWh
|
$3,788
-
kW-mo/yr
|
- | - | - | - | - | - | |
TOTAL RECOMMENDED | $823,027 | $150,811 |
$19,672
180,538
kWh
|
$8,133
-
kW-mo/yr
|
$11,201
-
MMBtu
|
$830
-
Tgal
|
$200,520 |
$3,463
-
Tgal
|
$445,000 | $134,208 | ||
TOTAL IMPLEMENTED | $547,740 | $63,451 |
$9,950
91,305
kWh
|
$3,088
-
kW-mo/yr
|
$11,201
-
MMBtu
|
$830
-
Tgal
|
$(-60,000.0) |
$3,463
-
Tgal
|
$445,000 | $134,208 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Water Consumption Savings | Primary Product Savings | Increase in Production Savings |