ITAC Assessment: MA0116
ITAC logo
ITAC Assessment: MA0116
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product CENTRALIZED LUB. EQUIPMENT
NAICS
n/a
SIC 3569: General Industrial Machinery and Equipment, Not Elsewhere
Sales Range $10
M
to 50
M
# of Employees 124
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,160
hrs
Location (State) Vermont

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $129,851 1,303,048
kWh
Fuel Oil #2 $8,317 1,919
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,993 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,841 $320 $3,841
37,808
kWh
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $435 $515 $108
1,172
kWh
$327
-
MMBtu
03 2.7243: Improve air circulation with destratification fans / other methods $6,585 - $(-1,001.0)
(-9,965)
kWh
$7,586
-
MMBtu
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $10,632 $1,450 $12,830
126,612
kWh
$(-2,198.0)
-
MMBtu
05 2.7226: Use computer programs to optimize hvac performance $9,500 $7,500 $9,500
93,787
kWh
-
TOTAL RECOMMENDED $30,993 $9,785 $25,278
249,414
kWh
$5,715
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs