ITAC Assessment: MS0458
ITAC logo
ITAC Assessment: MS0458
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Fuel and Oil Filtration
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 370
Plant Area 338,958
ft2
Annual Production 3,000,000
units
Production Hrs. Annual 4,680
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $443,108 4,150,200
kWh
Electricity Demand $124,644 9,148
kW-mo/yr
Natural Gas $75,233 62,161
MMBtu
TOTAL YEARLY COSTS $642,984
RECOMMENDED SAVINGS* $875,994 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 4.661: Level zero – install control systems for existing equipment $7,105 $13,400 $7,105
66,403
kWh
- -
02 2.7495: Install replacement doors $37,927 $16,051 $26,644
249,012
kWh
$11,283
-
MMBtu
-
03 2.9114: Use solar heat to make electricty $179,318 $1,231,714 $179,318
1,675,867
kWh
- -
04 4.631: Install an uninteruptable power supply $641,025 $2,463,127 - - $641,025
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,619 $6,958 $10,619
99,432
kWh
- -
TOTAL RECOMMENDED $875,994 $3,731,251 $223,686
2,090,714
kWh
$11,283
-
MMBtu
$641,025
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs