| Assessment Year | 2010 |
|---|---|
| Principal Product | Poultry Processing and Packaging |
| NAICS | 311615: Poultry Processing |
| SIC | 2015: Poultry Slaughtering and Processing |
| Sales Range | $100 M to 500M |
| # of Employees | 100 |
| Plant Area |
116,000
ft2
|
| Annual Production | 112,000,000
pieces
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,560,589 | 24,772,800 |
kWh
|
$0.063 |
| Electricity Demand | $341,721 | 56,588 |
kW-mo/yr
|
$6.04 |
| Natural Gas | $859,781 | 183,413 |
MMBtu
|
$4.69 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $201,081 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $17,592 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $80,818 | $182,391 | - |
$80,818
-
MMBtu
|
|
| 02 | 2.2691: Shut off cooling if cold outside air will cool process | $20,004 | $15,450 |
$20,004
318,036
kWh
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,970 | $31,888 |
$7,970
126,703
kWh
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,476 | $144,256 |
$13,476
214,250
kWh
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $384 | $1,579 |
$384
6,098
kWh
|
- | |
| 06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,798 | $7,980 |
$7,798
127,164
kWh
|
- | |
| 07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $23,330 | $17,280 |
$23,330
370,913
kWh
|
- | |
| 08 | 2.2136: Install / repair insulation on steam lines | $827 | $896 | - |
$827
-
MMBtu
|
|
| 09 | 2.2511: Insulate bare equipment | $10,734 | $5,136 |
$10,734
170,654
kWh
|
- | |
| 10 | 2.3137: Use power during off-peak periods | $34,743 | $99,978 |
$34,743
273,575
kWh
|
- | |
| 11 | 2.3132: Recharge batteries on during off-peak demand periods | $997 | $1,486 |
$997
-
kWh
|
- | |
| TOTAL RECOMMENDED | $201,081 | $508,320 |
$119,436
1,607,393
kWh
|
$81,645
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $17,592 | $42,250 |
$16,765
253,867
kWh
|
$827
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs