ITAC Assessment: OK0789
ITAC logo
ITAC Assessment: OK0789
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Poultry Processing and Packaging
NAICS 311615: Poultry Processing
SIC 2015: Poultry Slaughtering and Processing
Sales Range $100
M
to 500
M
# of Employees 100
Plant Area 116,000
ft2
Annual Production 112,000,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,560,589 24,772,800
kWh
Electricity Demand $341,721 56,588
kW-mo/yr
Natural Gas $859,781 183,413
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $201,081 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,592

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $80,818 $182,391 - $80,818
-
MMBtu
02 2.2691: Shut off cooling if cold outside air will cool process $20,004 $15,450 $20,004
318,036
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $7,970 $31,888 $7,970
126,703
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $13,476 $144,256 $13,476
214,250
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $384 $1,579 $384
6,098
kWh
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,798 $7,980 $7,798
127,164
kWh
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $23,330 $17,280 $23,330
370,913
kWh
-
08 2.2136: Install / repair insulation on steam lines $827 $896 - $827
-
MMBtu
09 2.2511: Insulate bare equipment $10,734 $5,136 $10,734
170,654
kWh
-
10 2.3137: Use power during off-peak periods $34,743 $99,978 $34,743
273,575
kWh
-
11 2.3132: Recharge batteries on during off-peak demand periods $997 $1,486 $997
-
kWh
-
TOTAL RECOMMENDED $201,081 $508,320 $119,436
1,607,393
kWh
$81,645
-
MMBtu
TOTAL IMPLEMENTED $17,592 $42,250 $16,765
253,867
kWh
$827
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs