Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Poultry processing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UK1210 #10 Y:2012 Install / repair insulation on steam lines $1,990 $1,060
UK1210 #09 Y:2012 Analyze flue gas for proper air/fuel ratio $4,708 $100
UK1210 #08 Y:2012 Keep boiler tubes clean $6,493 $2,410
UK1210 #07 Y:2012 Recover waste heat from equipment $52,633 $52,000
UK1210 #06 Y:2012 Utilize energy-efficient belts and other improved mechanisms $521 $180
UK1210 #05 Y:2012 Reduce illumination to minimum necessary levels $1,591 $1,000
UK1210 #04 Y:2012 Utilize controls to operate equipment only when needed $4,202 $500
UK1210 #03 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $5,598 $2,240
UK1210 #02 Y:2012 Reduce illumination to minimum necessary levels $7,955 $5,000
UK1210 #01 Y:2012 Use adjustable frequency drive or multiple speed motors on existing system $11,568 $12,500
TT0013 #05 Y:2007 Utilize higher efficiency lamps and/or ballasts $10,555 $60,943
TT0013 #04 Y:2007 Utilize higher efficiency lamps and/or ballasts $24,523 $88,373
TT0013 #03 Y:2007 Use flue gases to heat process or service water $235,000 $425,000
TT0013 #02 Y:2007 Eliminate leaks in inert gas and compressed air lines/ valves $8,410 $10,550
TT0013 #01 Y:2007 Optimize plant power factor $60,000 $180,000
TT0009 #06 Y:2007 Eliminate leaks in inert gas and compressed air lines/ valves $4,800 $10,900
TT0009 #05 Y:2007 Utilize higher efficiency lamps and/or ballasts $5,427 $4,810
TT0009 #04 Y:2007 Utilize higher efficiency lamps and/or ballasts $6,335 $8,476
TT0009 #03 Y:2007 Utilize higher efficiency lamps and/or ballasts $6,161 $15,206
TT0009 #02 Y:2007 Utilize higher efficiency lamps and/or ballasts $4,792 $12,144