ITAC Assessment: TT0013
ITAC logo
ITAC Assessment: TT0013
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Processed Poultry
NAICS 311615: Poultry Processing
SIC 2015: Poultry Slaughtering and Processing
Sales Range greater than $500
M
# of Employees 1,100
Plant Area 350,000
ft2
Annual Production 400,000,000
lb
Production Hrs. Annual 4,700
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,571,843 42,914,000
kWh
LPG $1,488,417 133,313
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $338,488 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings
01 2.3212: Optimize plant power factor $60,000 $180,000 $60,000
-
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,410 $10,550 $8,410
147,432
kWh
-
03 2.2425: Use flue gases to heat process or service water $235,000 $425,000 - $235,000
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $24,523 $88,373 $24,523
331,396
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $10,555 $60,943 $10,555
142,636
kWh
-
TOTAL RECOMMENDED $338,488 $764,866 $103,488
621,464
kWh
$235,000
-
MMBtu
TOTAL IMPLEMENTED - - - -