ITAC Assessment: TT0009
ITAC logo
ITAC Assessment: TT0009
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Chicken hatchlings and feed
NAICS 311615: Poultry Processing
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range less than $500
k
# of Employees 100
Plant Area 100,000
ft2
Annual Production 500,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $553,794 12,599,737
kWh
Electricity Demand $399,438 2,500
kW-mo/yr
Natural Gas $806,091 86,269
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,782 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $267 $537 $267
3,469
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,792 $12,144 $4,792
30,867
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,161 $15,206 $6,161
49,504
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $6,335 $8,476 $6,335
70,304
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $5,427 $4,810 $5,427
68,328
kWh
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,800 $10,900 $4,800
1,300
kWh
TOTAL RECOMMENDED $27,782 $52,073 $27,782
223,772
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs