ITAC Assessment: UK1210
ITAC logo
ITAC Assessment: UK1210
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Retail Chicken
NAICS 311615: Poultry Processing
SIC 2015: Poultry Slaughtering and Processing
Sales Range greater than $500
M
# of Employees 1,255
Plant Area 193,000
ft2
Annual Production 293,402,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,149,276 29,650,458
kWh
Electricity Demand $773,515 59,639
kW-mo/yr
Electricity Fees $(-237,288.0) -
Natural Gas $307,268 90,800
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $97,259 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,568 $12,500 $9,400
242,277
kWh
$2,168
-
kW-mo/yr
-
02 2.7111: Reduce illumination to minimum necessary levels $7,955 $5,000 $4,842
124,800
kWh
$3,113
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,598 $2,240 $3,158
81,405
kWh
$2,440
-
kW-mo/yr
-
04 2.6231: Utilize controls to operate equipment only when needed $4,202 $500 $4,202
108,290
kWh
- -
05 2.7111: Reduce illumination to minimum necessary levels $1,591 $1,000 $968
24,960
kWh
$623
-
kW-mo/yr
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $521 $180 $273
7,034
kWh
$248
-
kW-mo/yr
-
07 2.2437: Recover waste heat from equipment $52,633 $52,000 - - $52,633
-
MMBtu
08 2.1232: Keep boiler tubes clean $6,493 $2,410 - - $6,493
-
MMBtu
09 2.1233: Analyze flue gas for proper air/fuel ratio $4,708 $100 - - $4,708
-
MMBtu
10 2.2136: Install / repair insulation on steam lines $1,990 $1,060 - - $1,990
-
MMBtu
TOTAL RECOMMENDED $97,259 $76,990 $22,843
588,766
kWh
$8,592
-
kW-mo/yr
$65,824
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs