42
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Poultry processing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| LS2311 #05 Y:2023 | 05 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $11,014 | $39,200 | |
| LS2311 #04 Y:2023 | 04 | 2023 | Replace boiler | $81,818 | $210,000 | |
| LS2311 #03 Y:2023 | 03 | 2023 | Use most efficient type of electric motors | $3,096 | $3,700 | |
| LS2311 #02 Y:2023 | 02 | 2023 | Install vinyl strip / high speed / air curtain doors | $3,795 | $560 | |
| LS2311 #01 Y:2023 | 01 | 2023 | Reduce the pressure of compressed air to the minimum required | $1,616 | $25 | |
| LS0002 #06 Y:2017 | 06 | 2017 | Lease / purchase baler; sell cardboard to recycler | $8,736 | - | |
| LS0002 #05 Y:2017 | 05 | 2017 | Install floating covers on tanks of volatile materials to reduce evaporation | $271,330 | - | |
| LS0002 #04 Y:2017 | 04 | 2017 | Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings | $16,140 | - | |
| LS0002 #03 Y:2017 | 03 | 2017 | Install / repair insulation on steam lines | $1,124 | - | |
| LS0002 #02 Y:2017 | 02 | 2017 | Use waste heat from hot flue gases to preheat | $33,634 | - | |
| LS0002 #01 Y:2017 | 01 | 2017 | Analyze flue gas for proper air/fuel ratio | $7,531 | - | |
| LL0257 #10 Y:2006 | 10 | 2006 | Install occupancy sensors | $182 | $420 | |
| LL0257 #09 Y:2006 | 09 | 2006 | Reduce the pressure of compressed air to the minimum required | $2,389 | $90 | |
| LL0257 #08 Y:2006 | 08 | 2006 | Utilize higher efficiency lamps and/or ballasts | $889 | $700 | |
| LL0257 #07 Y:2006 | 07 | 2006 | Use photocell controls | $2,433 | $450 | |
| LL0257 #06 Y:2006 | 06 | 2006 | Insulate bare equipment | $5,404 | $5,120 | |
| LL0257 #05 Y:2006 | 05 | 2006 | Reduce excessive boiler blowdown | $10,380 | $18,000 | |
| LL0257 #04 Y:2006 | 04 | 2006 | Reduce illumination to minimum necessary levels | $10,875 | $810 | |
| LL0257 #03 Y:2006 | 03 | 2006 | Eliminate leaks in inert gas and compressed air lines/ valves | $20,217 | $7,960 | |
| LL0257 #02 Y:2006 | 02 | 2006 | Repair and eliminate steam leaks | $302,971 | $5,510 |