ITAC Assessment: LS0002
ITAC logo
ITAC Assessment: LS0002
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Poultry Products
NAICS 311615: Poultry Processing
SIC 2015: Poultry Slaughtering and Processing
Sales Range $100
M
to 500
M
# of Employees 750
Plant Area 301,600
ft2
Annual Production 275,600,000
lb
Production Hrs. Annual 6,264
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,025,794 55,732,800
kWh
Electricity Demand $968,333 115,968
kW-mo/yr
Electricity Fees $146,377 -
Natural Gas $1,020,673 279,190
MMBtu
Fuel Oil #1 $586,300 36,612
MMBtu
Fuel Oil #2 $405,680 25,333
MMBtu
Waste Disposal Costs
Water Usage $320,342 482,236
Tgal
Water Disposal $14,296 2,673
Tgal
Solid Waste (non-haz) $85,226 5,570,350
lb
TOTAL YEARLY COSTS $6,573,021
RECOMMENDED SAVINGS* $338,495 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $7,531 - - $7,531
-
MMBtu
-
02 2.2414: Use waste heat from hot flue gases to preheat $33,634 - - $33,634
-
MMBtu
-
03 2.2136: Install / repair insulation on steam lines $1,124 - - $1,124
-
MMBtu
-
04 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $16,140 - $16,140
208,320
kWh
- -
05 3.8124: Install floating covers on tanks of volatile materials to reduce evaporation $271,330 - - $271,330
-
MMBtu
-
06 3.5315: Lease / purchase baler; sell cardboard to recycler $8,736 - - - $8,736
-
lb
TOTAL RECOMMENDED $338,495 - $16,140
208,320
kWh
$313,619
-
MMBtu
$8,736
-
lb
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs