Assessment Year | 2017 |
---|---|
Principal Product | Poultry Products |
NAICS | 311615: Poultry Processing |
SIC | 2015: Poultry Slaughtering and Processing |
Sales Range | $100 M to 500M |
# of Employees | 750 |
Plant Area |
301,600
ft2
|
Annual Production | 275,600,000
lb
|
Production Hrs. Annual | 6,264
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $3,025,794 | 55,732,800 |
kWh
|
$0.054 | |
Electricity Demand | $968,333 | 115,968 |
kW-mo/yr
|
$8.35 | |
Electricity Fees | $146,377 | - |
|
- | |
Natural Gas | $1,020,673 | 279,190 |
MMBtu
|
$3.66 | |
Fuel Oil #1 | $586,300 | 36,612 |
MMBtu
|
$16.01 | |
Fuel Oil #2 | $405,680 | 25,333 |
MMBtu
|
$16.01 | |
Waste Disposal Costs | |||||
Water Usage | $320,342 | 482,236 |
Tgal
|
$0.66 | |
Water Disposal | $14,296 | 2,673 |
Tgal
|
$5.35 | |
Solid Waste (non-haz) | $85,226 | 5,570,350 |
lb
|
$0.015 | |
TOTAL YEARLY COSTS | $6,573,021 | ||||
RECOMMENDED SAVINGS* | $338,495 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $7,531 | - | - |
$7,531
-
MMBtu
|
- | |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $33,634 | - | - |
$33,634
-
MMBtu
|
- | |
03 | 2.2136: Install / repair insulation on steam lines | $1,124 | - | - |
$1,124
-
MMBtu
|
- | |
04 | 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings | $16,140 | - |
$16,140
208,320
kWh
|
- | - | |
05 | 3.8124: Install floating covers on tanks of volatile materials to reduce evaporation | $271,330 | - | - |
$271,330
-
MMBtu
|
- | |
06 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $8,736 | - | - | - |
$8,736
-
lb
|
|
TOTAL RECOMMENDED | $338,495 | - |
$16,140
208,320
kWh
|
$313,619
-
MMBtu
|
$8,736
-
lb
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs