Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Automotive hinges, brakes, seat structure
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 98
Plant Area 188,000
ft2
Annual Production 2,000,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $199,817 2,458,640
kWh
Electricity Demand $20,734 8,544
kW-mo/yr
Natural Gas $19,909 6,618
MMBtu
TOTAL YEARLY COSTS $240,461
RECOMMENDED SAVINGS* $22,728 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,785

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $392 $50 $333
4,106
kWh
$59
-
kW-mo/yr
- -
02 2.2437: Recover waste heat from equipment $2,451 $550 - - $2,451
-
MMBtu
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $287 - $287
3,538
kWh
- - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $191 - $191
2,359
kWh
- - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,395 - $1,395
17,219
kWh
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,070 $6,750 $486
6,000
kWh
$44
-
kW-mo/yr
- $540
07 2.7142: Utilize higher efficiency lamps and/or ballasts $11,382 $67,952 $3,967
49,000
kWh
$357
-
kW-mo/yr
- $7,058
08 2.7232: Replace existing hvac unit with high efficiency model $3,182 $31,250 $2,937
36,250
kWh
$245
-
kW-mo/yr
- -
09 2.4221: Install compressor air intakes in coolest locations $2,379 $1,400 $2,182
26,940
kWh
$196
-
kW-mo/yr
- -
TOTAL RECOMMENDED $22,728 $107,952 $11,777
145,412
kWh
$901
-
kW-mo/yr
$2,451
-
MMBtu
$7,598
TOTAL IMPLEMENTED $5,785 $7,350 $2,691
33,222
kWh
$103
-
kW-mo/yr
$2,451
-
MMBtu
$540
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs