Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

227

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Rendering and meat byproduct processing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0580 #08 Y:2025 Install occupancy sensors $436 $1,102
SU0580 #07 Y:2025 Use or replace with energy efficient substitutes $243 $531
SU0580 #06 Y:2025 Insulate bare equipment $281 $370
SU0580 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $172 $69
SU0580 #04 Y:2025 Use or replace with energy efficient substitutes $404 $89
SU0580 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $1,993 $246
SU0580 #02 Y:2025 Reduce space conditioning during non-working hours $110 -
SU0580 #01 Y:2025 Reschedule plant operations or reduce load to avoid peaks $2,986 -
GT0975 #07 Y:2024 Minimize water usage $64,161 $237,800
GT0975 #06 Y:2024 Use steam condensate for hot water supply (non-potable) $4,603 $11,665
GT0975 #05 Y:2024 Repair and eliminate steam leaks $770 $1,850
GT0975 #04 Y:2024 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $39,992 $87,500
GT0975 #03 Y:2024 Utilize energy-efficient belts and other improved mechanisms $1,280 $1,334
GT0975 #02 Y:2024 Install / repair insulation on steam lines $3,668 $2,732
GT0975 #01 Y:2024 Install timers on light switches in little used areas $442 $197
IC0278 #04 Y:2023 Eliminate leaks in water lines and valves $5,040 $600
IC0278 #03 Y:2023 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $175,901 $710,922
IC0278 #02 Y:2023 Use waste heat from hot flue gases to preheat incoming fluids $5,879 $15,415
IC0278 #01 Y:2023 Use solar heat to make electricty $147,541 $1,271,712
MZ0309 #07 Y:2021 Optimize plant power factor $354,701 $442,138