Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

482

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Meat processed from carcasses
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LS2501 #04 Y:2024 Replace existing equipment with more suitable substitutes $71,253 $442,396
LS2501 #03 Y:2024 Install an uninteruptable power supply $12,000 $10,000
LS2501 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $536 $90
LS2501 #01 Y:2024 Clean and maintain refrigerant condensers and towers $2,529 -
OR0792 #07 Y:2024 Purchase equipment instead of leasing $395,376 $1,242,029
OR0792 #06 Y:2024 Install occupancy sensors $2,667 $3,106
OR0792 #05 Y:2024 Use closed cycle process to minimize waste water production $7,380 $6,624
OR0792 #04 Y:2024 Install / repair insulation on steam lines $6,357 $3,090
OR0792 #03 Y:2024 Install vinyl strip / high speed / air curtain doors $37,200 $18,409
OR0792 #02 Y:2024 Reduce the pressure of compressed air to the minimum required $15,081 $1,119
OR0792 #01 Y:2024 Turn off equipment when not in use $1,993 -
AM0897 #08 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $215 $100
AM0897 #07 Y:2023 Reduce the pressure of compressed air to the minimum required $300 $22
AM0897 #06 Y:2023 Install occupancy sensors $460 $98
AM0897 #05 Y:2023 Utilize energy-efficient belts and other improved mechanisms $620 -
AM0897 #04 Y:2023 Use photocell controls $520 $102
AM0897 #03 Y:2023 Utilize higher efficiency lamps and/or ballasts $1,060 $4,860
AM0897 #02 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $13,400 $32,265
AM0897 #01 Y:2023 Optimize plant power factor $32,420 $45,905
OK1104 #04 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $179 $580