| Assessment Year | 2026 |
|---|---|
| Principal Product | Beef Jerky |
| NAICS | 311612: Meat Processed from Carcasses |
| SIC | 2013: Sausages and Other Prepared Meat Products |
| Sales Range | $50 M to 100M |
| # of Employees | 200 |
| Plant Area |
99,000
ft2
|
| Annual Production | 70,000
ton
|
| Production Hrs. Annual | 4,680
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $72,564 | 971,100 |
kWh
|
$0.075 | |
| Electricity Demand | $22,759 | 2,785 |
kW-mo/yr
|
$8.17 | |
| Natural Gas | $49,614 | 12,741 |
MMBtu
|
$3.89 | |
| Waste Disposal Costs | |||||
| Water Usage | $43,658 | 5,113 |
Tgal
|
$8.54 | |
| Water Disposal | $11,486 | 5,113 |
Tgal
|
$2.25 | |
| TOTAL YEARLY COSTS | $200,081 | ||||
| RECOMMENDED SAVINGS* | $29,592 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $14,044 | $123,552 |
$14,044
187,249
kWh
|
|
| 02 | 2.7232: Replace existing hvac unit with high efficiency model | $922 | $4,510 |
$922
12,291
kWh
|
|
| 03 | 2.7226: Use computer programs to optimize hvac performance | $9,389 | $128,500 |
$9,389
125,192
kWh
|
|
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,337 | $5,221 |
$3,337
44,493
kWh
|
|
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $936 | - |
$936
12,481
kWh
|
|
| 06 | 2.6211: Conserve energy by efficient use of vending machines | $846 | $1,140 |
$846
11,283
kWh
|
|
| 07 | 2.7135: Install occupancy sensors | $118 | $990 |
$118
1,583
kWh
|
|
| TOTAL RECOMMENDED | $29,592 | $263,913 |
$29,592
394,572
kWh
|
||
| TOTAL IMPLEMENTED | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs