Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

352

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Animal (except poultry) slaughtering
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MI0433 #05 Y:2023 Pay utility bills on time $202 -
MI0433 #04 Y:2023 Optimize plant power factor $1,297 $1,752
MI0433 #03 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $1,622 $1,720
MI0433 #02 Y:2023 Utilize higher efficiency lamps and/or ballasts $2,706 $3,257
MI0433 #01 Y:2023 Eliminate or reduce compressed air usage $3,476 $80
NL0086 #05 Y:2023 Keep equipment clean $350 $450
NL0086 #04 Y:2023 Utilize energy-efficient belts and other improved mechanisms $573 $510
NL0086 #03 Y:2023 Meter waste water $4,239 $1,348
NL0086 #02 Y:2023 Insulate bare equipment $6,202 $6,211
NL0086 #01 Y:2023 Modify refrigeration system to operate at a lower pressure $48,136 $100,000
MI0420 #10 Y:2023 Pay utility bills on time $111 -
MI0420 #09 Y:2023 Utilize daylight whenever possible in lieu of artificial light $1,456 $280
MI0420 #08 Y:2023 Install vinyl strip / high speed / air curtain doors $5,784 $3,190
MI0420 #07 Y:2023 Use solar heat to make electricty $13,017 $86,104
MI0420 #06 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $14,309 $1,980
MI0420 #05 Y:2023 Turn off equipment when not in use $15,797 -
MI0420 #04 Y:2023 Use a less expensive method of waste removal $22,620 $52,100
MI0420 #03 Y:2023 Utilize higher efficiency lamps and/or ballasts $24,929 $163,200
MI0420 #02 Y:2023 Adjust burners for efficient operation $25,315 $1,760
MI0420 #01 Y:2023 Lower temperature during the winter season and vice-versa $65,480 $580