ITAC Assessment: MI0433
ITAC logo
ITAC Assessment: MI0433
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Cattle Head
NAICS 311611: Animal (except Poultry) Slaughtering
SIC 2011: Meat Packing Plants
Sales Range $1
M
to 5
M
# of Employees 20
Plant Area 17,450
ft2
Annual Production 5,000
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Puerto Rico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $89,128 361,463
kWh
Electricity Demand $9,185 965
kW-mo/yr
Electricity Fees $2,512 -
TOTAL YEARLY COSTS $100,825
RECOMMENDED SAVINGS* $9,303 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.4239: Eliminate or reduce compressed air usage $3,476 $80 $2,425
9,859
kWh
$1,051
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,706 $3,257 $2,296
9,334
kWh
$410
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,622 $1,720 $1,251
5,086
kWh
$371
-
kW-mo/yr
-
04 2.3212: Optimize plant power factor $1,297 $1,752 - $1,297
-
kW-mo/yr
-
05 2.8123: Pay utility bills on time $202 - - - $202
TOTAL RECOMMENDED $9,303 $6,809 $5,972
24,279
kWh
$3,129
-
kW-mo/yr
$202
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs