ITAC Assessment: IA0118
ITAC logo
ITAC Assessment: IA0118
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product bags
NAICS
n/a
SIC 2673: Plastics, Foil, and Coated Paper Bags
Sales Range $10
M
to 50
M
# of Employees 230
Plant Area 124,400
ft2
Annual Production 277,700,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $136,664 2,781,067
kWh
Natural Gas $22,532 5,196
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $80,440 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $57,110

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4322: Use or replace with energy efficient substitutes $14,717 $25,220 $14,717
259,965
kWh
- -
02 2.4239: Eliminate or reduce compressed air usage $12,263 $1,888 $12,263
216,589
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,614 $4,330 $1,614
28,429
kWh
- -
04 2.2437: Recover waste heat from equipment $957 $610 - $957
-
MMBtu
-
05 2.4221: Install compressor air intakes in coolest locations $1,175 $485 $1,175
20,516
kWh
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,004 $25 $1,004
17,878
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $4,861 $12,260 $4,861
85,873
kWh
- -
08 2.7111: Reduce illumination to minimum necessary levels $3,388 $425 $3,388
58,910
kWh
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,047 $2,700 $1,047
18,464
kWh
- -
10 2.7135: Install occupancy sensors $487 $1,470 $487
8,499
kWh
- -
11 2.6214: Shut off pilots in standby equipment $280 $50 - $280
-
MMBtu
-
12 2.7224: Reduce space conditioning during non-working hours $237 - $237
4,103
kWh
- -
13 3.1175: Use a different or recycled raw material $38,410 - - - $38,410
-
lb
TOTAL RECOMMENDED $80,440 $49,463 $40,793
719,226
kWh
$1,237
-
MMBtu
$38,410
-
lb
TOTAL IMPLEMENTED $57,110 $30,645 $17,743
313,013
kWh
$957
-
MMBtu
$38,410
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs