ITAC Assessment: SU0496
ITAC logo
ITAC Assessment: SU0496
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Medicines and Dry Tablet Packaging
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $1
M
to 5
M
# of Employees 200
Plant Area 620,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 8,736
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $637,792 18,824,967
kWh
Electricity Demand $478,245 40,234
kW-mo/yr
Electricity Fees $47,613 -
Natural Gas $118,277 54,623
MMBtu
Waste Disposal Costs
Water Usage $79,041 32,190,000
Tgal
TOTAL YEARLY COSTS $1,360,968
RECOMMENDED SAVINGS* $78,332 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,459

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7224: Reduce space conditioning during non-working hours $255 - - - $255
-
MMBtu
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,574 - $1,574
46,301
kWh
- - - -
03 2.7241: Install outside air damper / economizer on hvac unit $40,299 $37,144 - - $40,299
-
MMBtu
- -
04 2.2136: Install / repair insulation on steam lines $191 $196 - - $191
-
MMBtu
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $34,753 $34,048 $8,994
264,528
kWh
$4,989
-
kW-mo/yr
- - $20,770
06 2.7142: Utilize higher efficiency lamps and/or ballasts $706 $845 $226
6,658
kWh
$108
-
kW-mo/yr
- $221 $151
07 2.7241: Install outside air damper / economizer on hvac unit $554 $1,657 $554
16,290
kWh
- - - -
TOTAL RECOMMENDED $78,332 $73,890 $11,348
333,777
kWh
$5,097
-
kW-mo/yr
$40,745
-
MMBtu
$221 $20,921
TOTAL IMPLEMENTED $35,459 $34,893 $9,220
271,186
kWh
$5,097
-
kW-mo/yr
- $221 $20,921
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs