Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

235

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Ice cream and frozen dessert manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AM0643 #03 Y:2013 Install occupancy sensors $2,700 $1,800
AM0643 #02 Y:2013 Reduce the pressure of compressed air to the minimum required $12,370 $50
AM0643 #01 Y:2013 Increase amount of condensate returned $34,060 $250,000
MZ0092 #09 Y:2012 Eliminate or reduce compressed air usage $512 $212
MZ0092 #08 Y:2012 Reduce the pressure of compressed air to the minimum required $567 $140
MZ0092 #07 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $1,516 $263
MZ0092 #06 Y:2012 Use waste heat from hot flue gases to preheat $6,645 $26,468
MZ0092 #05 Y:2012 Insulate bare equipment $6,999 $3,738
MZ0092 #04 Y:2012 Use waste heat from hot flue gases to preheat $8,547 $26,468
MZ0092 #03 Y:2012 Analyze flue gas for proper air/fuel ratio $9,594 $1,000
MZ0092 #02 Y:2012 Utilize controls to operate equipment only when needed $14,312 $28,500
MZ0092 #01 Y:2012 Repair or replace steam traps $14,965 $4,500
LE0290 #12 Y:2009 Utilize higher efficiency lamps and/or ballasts $990 $2,500
LE0290 #11 Y:2009 Utilize a less expensive cooling method $900 $1,500
LE0290 #10 Y:2009 Install occupancy sensors $1,045 -
LE0290 #09 Y:2009 Recover waste heat from equipment $1,150 $2,500
LE0290 #08 Y:2009 Use heat from boiler blowdown to preheat boiler feed water $1,204 $2,500
LE0290 #07 Y:2009 Install compressor air intakes in coolest locations $1,267 -
LE0290 #06 Y:2009 Remove or close off unneeded compressed air lines $1,400 $500
LE0290 #05 Y:2009 Reduce the pressure of compressed air to the minimum required $2,148 $152