| Assessment Year | 2012 |
|---|---|
| Principal Product | Ice Cream Novelty items |
| NAICS | 311520: Ice Cream and Frozen Dessert Manufacturing |
| SIC | 2024: Ice Cream and Frozen Desserts |
| Sales Range | $100 M to 500M |
| # of Employees | 243 |
| Plant Area |
150,000
ft2
|
| Annual Production | 26,837
ton
|
| Production Hrs. Annual | 8,232
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $428,476 | 17,092,800 |
kWh
|
$0.025 |
| Electricity Demand | $186,305 | 37,714 |
kW-mo/yr
|
$4.94 |
| Electricity Fees | $23,054 | - |
|
- |
| Natural Gas | $291,767 | 32,097 |
MMBtu
|
$9.09 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $63,657 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $33,641 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.2113: Repair or replace steam traps | $14,965 | $4,500 | - | - |
$15,035
-
MMBtu
|
$(-70.0) | |
| 02 | 2.6231: Utilize controls to operate equipment only when needed | $14,312 | $28,500 |
$14,312
753,244
kWh
|
- | - | - | |
| 03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $9,594 | $1,000 | - | - |
$9,699
-
MMBtu
|
$(-105.0) | |
| 04 | 2.2414: Use waste heat from hot flue gases to preheat | $8,547 | $26,468 | - | - |
$8,547
-
MMBtu
|
- | |
| 05 | 2.2511: Insulate bare equipment | $6,999 | $3,738 | - | - |
$6,999
-
MMBtu
|
- | |
| 06 | 2.2414: Use waste heat from hot flue gases to preheat | $6,645 | $26,468 | - | - |
$6,645
-
MMBtu
|
- | |
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,516 | $263 |
$1,099
57,849
kWh
|
$417
-
kW-mo/yr
|
- | - | |
| 08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $567 | $140 |
$411
21,642
kWh
|
$156
-
kW-mo/yr
|
- | - | |
| 09 | 2.4239: Eliminate or reduce compressed air usage | $512 | $212 |
$512
26,969
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $63,657 | $91,289 |
$16,334
859,704
kWh
|
$573
-
kW-mo/yr
|
$46,925
-
MMBtu
|
$(-175.0) | ||
| TOTAL IMPLEMENTED | $33,641 | $9,641 |
$1,510
79,491
kWh
|
$573
-
kW-mo/yr
|
$31,733
-
MMBtu
|
$(-175.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs