Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

235

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Ice cream and frozen dessert manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT0918 #03 Y:2018 Utilize higher efficiency lamps and/or ballasts $3,373 $5,449
GT0918 #02 Y:2018 Reduce the pressure of compressed air to the minimum required $4,414 $3,500
GT0918 #01 Y:2018 Pay bills on time to avoid late fees $3,016 $1,488
AM0743 #08 Y:2017 Use minimum steam operating pressure $280 $13
AM0743 #07 Y:2017 Utilize energy-efficient belts and other improved mechanisms $1,701 -
AM0743 #06 Y:2017 Utilize higher efficiency lamps and/or ballasts $1,570 $1,820
AM0743 #05 Y:2017 Utilize higher efficiency lamps and/or ballasts $865 $3,190
AM0743 #04 Y:2017 Eliminate or reduce compressed air usage $10,440 $1,025
AM0743 #03 Y:2017 Reduce the pressure of compressed air to the minimum required $11,080 $13
AM0743 #02 Y:2017 Optimize plant power factor $4,300 $8,300
AM0743 #01 Y:2017 Optimize plant power factor $4,100 $6,700
UD0938 #11 Y:2015 Minimize water usage $27,153 $9,300
UD0938 #10 Y:2015 Install compressor air intakes in coolest locations $1,880 $15,000
UD0938 #09 Y:2015 Replace existing hvac unit with high efficiency model $807 $3,133
UD0938 #08 Y:2015 Use adjustable frequency drive or multiple speed motors on existing system $4,596 $20,100
UD0938 #07 Y:2015 Develop a repair/replace policy $152 $530
UD0938 #06 Y:2015 Utilize energy-efficient belts and other improved mechanisms $1,415 -
UD0938 #05 Y:2015 Modify refrigeration system to operate at a lower pressure $29,938 $3,000
UD0938 #04 Y:2015 Upgrade controls on compressors $107,431 -
UD0938 #03 Y:2015 Recharge batteries on during off-peak demand periods $1,403 -