| Assessment Year | 2018 |
|---|---|
| Principal Product | Ice Cream |
| NAICS | 311520: Ice Cream and Frozen Dessert Manufacturing |
| SIC | 2024: Ice Cream and Frozen Desserts |
| Sales Range | $5 M to 10M |
| # of Employees | 55 |
| Plant Area |
22,000
ft2
|
| Annual Production | 873,600
units
|
| Production Hrs. Annual | 2,600
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $145,930 | 1,456,440 |
kWh
|
$0.10 |
| Natural Gas | $22,909 | 3,882 |
MMBtu
|
$5.90 |
| TOTAL YEARLY COSTS | $168,839 | |||
| RECOMMENDED SAVINGS* | $69,730 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $11,035 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 4.821: Pay bills on time to avoid late fees | $3,016 | $1,488 | - | $3,016 | - | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,414 | $3,500 |
$4,414
44,138
kWh
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,373 | $5,449 |
$3,373
33,726
kWh
|
- | - | |
| 04 | 2.2626: Avoid frost formation on evaporators | $47,297 | $90,000 |
$47,297
410,969
kWh
|
- | - | |
| 05 | 2.2211: Use optimum temperature | $8,768 | $23,162 | - | - |
$8,768
-
MMBtu
|
|
| 06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $232 | $1,000 | - | - |
$232
-
MMBtu
|
|
| 07 | 2.2121: Increase amount of condensate returned | $2,630 | $13,862 | - | - |
$2,630
-
MMBtu
|
|
| TOTAL RECOMMENDED | $69,730 | $138,461 |
$55,084
488,833
kWh
|
$3,016 |
$11,630
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $11,035 | $11,437 |
$7,787
77,864
kWh
|
$3,016 |
$232
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs