235
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OK1016 #07 Y:2019 | 07 | 2019 | Repair faulty insulation in furnaces, boilers, etc | $485 | $636 | |
| OK1016 #06 Y:2019 | 06 | 2019 | Preheat boiler makeup water with waste process heat | $885 | $4,860 | |
| OK1016 #05 Y:2019 | 05 | 2019 | Recharge batteries on during off-peak demand periods | $1,523 | - | |
| OK1016 #04 Y:2019 | 04 | 2019 | Reduce the pressure of compressed air to the minimum required | $4,330 | - | |
| OK1016 #03 Y:2019 | 03 | 2019 | Use adjustable frequency drive or multiple speed motors on existing system | $6,766 | $9,480 | |
| OK1016 #02 Y:2019 | 02 | 2019 | Utilize higher efficiency lamps and/or ballasts | $5,028 | $28,358 | |
| OK1016 #01 Y:2019 | 01 | 2019 | Utilize controls to operate equipment only when needed | $27,210 | $730 | |
| SU0481 #09 Y:2019 | 09 | 2019 | Conserve energy by efficient use of vending machines | $331 | $996 | |
| SU0481 #08 Y:2019 | 08 | 2019 | Use waste heat from hot flue gases to preheat | $6,126 | $15,784 | |
| SU0481 #07 Y:2019 | 07 | 2019 | Install occupancy sensors | $640 | $1,168 | |
| SU0481 #06 Y:2019 | 06 | 2019 | Utilize higher efficiency lamps and/or ballasts | $305 | $360 | |
| SU0481 #05 Y:2019 | 05 | 2019 | Eliminate/reduce an operation | $1,649 | $2,041 | |
| SU0481 #04 Y:2019 | 04 | 2019 | Utilize higher efficiency lamps and/or ballasts | $12,137 | $13,202 | |
| SU0481 #03 Y:2019 | 03 | 2019 | Insulate bare equipment | $1,779 | $1,023 | |
| SU0481 #02 Y:2019 | 02 | 2019 | Install vinyl strip / high speed / air curtain doors | $1,034 | $28 | |
| SU0481 #01 Y:2019 | 01 | 2019 | Disconnect ballasts | $2,630 | - | |
| GT0918 #07 Y:2018 | 07 | 2018 | Increase amount of condensate returned | $2,630 | $13,862 | |
| GT0918 #06 Y:2018 | 06 | 2018 | Analyze flue gas for proper air/fuel ratio | $232 | $1,000 | |
| GT0918 #05 Y:2018 | 05 | 2018 | Use optimum temperature | $8,768 | $23,162 | |
| GT0918 #04 Y:2018 | 04 | 2018 | Avoid frost formation on evaporators | $47,297 | $90,000 |