ITAC Assessment: OK1016
ITAC logo
ITAC Assessment: OK1016
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Ice cream and frozen dessert
NAICS 311520: Ice Cream and Frozen Dessert Manufacturing
SIC 2024: Ice Cream and Frozen Desserts
Sales Range $100
M
to 500
M
# of Employees 249
Plant Area 141,803
ft2
Annual Production 12,400,000
units
Production Hrs. Annual 6,600
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $615,484 14,080,500
kWh
Electricity Demand $261,772 33,010
kW-mo/yr
Electricity Fees $3,360 -
Natural Gas $149,763 50,575
MMBtu
Waste Disposal Costs
Water Usage $45,134 802,280
Tgal
Water Disposal $23,773 608
Tgal
TOTAL YEARLY COSTS $1,099,286
RECOMMENDED SAVINGS* $46,227 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,843

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings
01 2.6231: Utilize controls to operate equipment only when needed $27,210 $730 $27,210
618,399
kWh
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,028 $28,358 $3,791
86,150
kWh
$1,237
-
kW-mo/yr
- - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,766 $9,480 $6,766
153,781
kWh
- - - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $4,330 - $4,330
98,410
kWh
- - - -
05 2.3132: Recharge batteries on during off-peak demand periods $1,523 - - $1,523
-
kW-mo/yr
- - -
06 2.2441: Preheat boiler makeup water with waste process heat $885 $4,860 - - $734
-
MMBtu
$89
-
Tgal
$62
-
Tgal
07 2.1131: Repair faulty insulation in furnaces, boilers, etc $485 $636 $485
11,025
kWh
- - - -
TOTAL RECOMMENDED $46,227 $44,064 $42,582
967,765
kWh
$2,760
-
kW-mo/yr
$734
-
MMBtu
$89
-
Tgal
$62
-
Tgal
TOTAL IMPLEMENTED $9,843 $28,994 $8,606
195,585
kWh
$1,237
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs