Assessment Year | 1995 |
---|---|
Principal Product | Concrete Blocks |
NAICS |
n/a
|
SIC | 3271: Concrete Block and Brick |
Sales Range | $10 M to 50M |
# of Employees | 185 |
Plant Area |
479,160
ft2
|
Annual Production | 9,000,000
pieces
|
Production Hrs. Annual | 3,770
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $110,105 | 888,335 |
kWh
|
$0.12 |
Natural Gas | $1,623 | 214 |
MMBtu
|
$7.58 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $13,699 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,429 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $7,427 | $6,900 |
$7,427
59,789
kWh
|
|
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,270 | $1,750 |
$1,270
10,258
kWh
|
|
03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $633 | - |
$633
4,982
kWh
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,025 | $2,700 |
$1,025
8,206
kWh
|
|
05 | 2.7144: Install spectral reflectors / delamp | $1,352 | $825 |
$1,352
10,551
kWh
|
|
06 | 2.7135: Install occupancy sensors | $251 | $320 |
$251
2,052
kWh
|
|
07 | 2.7134: Use photocell controls | $1,351 | $336 |
$1,351
10,258
kWh
|
|
08 | 2.7132: Install timers on light switches in little used areas | $390 | $175 |
$390
2,931
kWh
|
|
TOTAL RECOMMENDED | $13,699 | $13,006 |
$13,699
109,027
kWh
|
||
TOTAL IMPLEMENTED | $12,429 | $11,256 |
$12,429
98,769
kWh
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs