ITAC Assessment: SD0111
ITAC logo
ITAC Assessment: SD0111
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Concrete Blocks
NAICS
n/a
SIC 3271: Concrete Block and Brick
Sales Range $10
M
to 50
M
# of Employees 185
Plant Area 479,160
ft2
Annual Production 9,000,000
pieces
Production Hrs. Annual 3,770
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $110,105 888,335
kWh
Natural Gas $1,623 214
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,699 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,429

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $7,427 $6,900 $7,427
59,789
kWh
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,270 $1,750 $1,270
10,258
kWh
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $633 - $633
4,982
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,025 $2,700 $1,025
8,206
kWh
05 2.7144: Install spectral reflectors / delamp $1,352 $825 $1,352
10,551
kWh
06 2.7135: Install occupancy sensors $251 $320 $251
2,052
kWh
07 2.7134: Use photocell controls $1,351 $336 $1,351
10,258
kWh
08 2.7132: Install timers on light switches in little used areas $390 $175 $390
2,931
kWh
TOTAL RECOMMENDED $13,699 $13,006 $13,699
109,027
kWh
TOTAL IMPLEMENTED $12,429 $11,256 $12,429
98,769
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs