Assessment Year | 2001 |
---|---|
Principal Product | Fabricated Metal Parts |
NAICS |
n/a
|
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 49 |
Plant Area |
115,000
ft2
|
Annual Production | 276,514
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $132,433 | 1,843,584 |
kWh
|
$0.072 |
Natural Gas | $86,009 | 9,998 |
MMBtu
|
$8.60 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $77,815 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $46,521 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7231: Use radiant heater for spot heating | $15,187 | $19,000 |
$1,569
24,483
kWh
|
$13,618
-
MMBtu
|
- | - | - | |
02 | 2.7135: Install occupancy sensors | $6,626 | $1,500 |
$6,626
92,277
kWh
|
- | - | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,862 | $1,900 |
$4,862
67,709
kWh
|
- | - | - | - | |
04 | 2.4133: Use most efficient type of electric motors | $3,125 | $5,140 |
$3,125
43,524
kWh
|
- | - | - | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $750 | - |
$750
10,447
kWh
|
- | - | - | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $671 | $1,000 |
$671
9,352
kWh
|
- | - | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $226 | $210 |
$143
1,997
kWh
|
- | - | - | $83 | |
08 | 3.4151: Minimize water usage | $400 | $1,125 | - | - |
$400
-
Tgal
|
- | - | |
09 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $118 | $300 | - | - | - |
$118
-
lb
|
- | |
10 | 4.652: Replace existing equipment with more suitable substitutes | $45,850 | $5,000 | - | - | - | - | $45,850 | |
TOTAL RECOMMENDED | $77,815 | $35,175 |
$17,746
249,789
kWh
|
$13,618
-
MMBtu
|
$400
-
Tgal
|
$118
-
lb
|
$45,933 | ||
TOTAL IMPLEMENTED | $46,521 | $6,000 |
$671
9,352
kWh
|
- | - | - | $45,850 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs