ITAC Assessment: BD0017
ITAC logo
ITAC Assessment: BD0017
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Cable & Wire Harness Assemblies
NAICS
n/a
SIC 3678: Electronic Connectors
Sales Range $10
M
to 50
M
# of Employees 270
Plant Area 100,000
ft2
Annual Production 75,000
pieces
Production Hrs. Annual 7,500
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $100,478 1,984,467
kWh
Natural Gas $38,493 8,261
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,788 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,841

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,722 $12,235 $5,722
83,236
kWh
-
02 2.7111: Reduce illumination to minimum necessary levels $13,392 $20 $13,392
195,193
kWh
-
03 2.4133: Use most efficient type of electric motors $627 $1,550 $627
9,086
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $119 $242 $119
1,758
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $119 $400 $119
1,758
kWh
-
06 2.7444: Close holes and openings in building such as broken windows $809 $475 - $809
-
MMBtu
TOTAL RECOMMENDED $20,788 $14,922 $19,979
291,031
kWh
$809
-
MMBtu
TOTAL IMPLEMENTED $5,841 $12,635 $5,841
84,994
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs