ITAC Assessment: SU0481
ITAC logo
ITAC Assessment: SU0481
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Ice Cream
NAICS 311520: Ice Cream and Frozen Dessert Manufacturing
SIC 2024: Ice Cream and Frozen Desserts
Sales Range $50
M
to 100
M
# of Employees 450
Plant Area 250,000
ft2
Annual Production 8,700
Tgal
Production Hrs. Annual 7,200
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,311,522 37,492,736
kWh
Electricity Demand $1,031,809 73,453
kW-mo/yr
Electricity Fees $78,764 -
Natural Gas $296,460 65,166
MMBtu
Waste Disposal Costs
Water Usage $383,528 134
Tgal
Water Disposal $1,408,346 1,000
Tgal
Solid Waste (non-haz) $1,007,075 2,000
lb
TOTAL YEARLY COSTS $5,517,504
RECOMMENDED SAVINGS* $26,631 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,476

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7122: Disconnect ballasts $2,630 - $1,580
45,144
kWh
$1,050
-
kW-mo/yr
- - -
02 2.7447: Install vinyl strip / high speed / air curtain doors $1,034 $28 - - $1,034
-
MMBtu
- -
03 2.2511: Insulate bare equipment $1,779 $1,023 - - $1,779
-
MMBtu
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $12,137 $13,202 $7,280
208,008
kWh
$4,871
-
kW-mo/yr
- - $(-14.0)
05 3.1161: Eliminate/reduce an operation $1,649 $2,041 $(-14.0)
(-390)
kWh
$(-337.0)
-
kW-mo/yr
- - $2,000
06 2.7142: Utilize higher efficiency lamps and/or ballasts $305 $360 $123
3,504
kWh
$67
-
kW-mo/yr
- $75 $40
07 2.7135: Install occupancy sensors $640 $1,168 $640
18,288
kWh
- - - -
08 2.2414: Use waste heat from hot flue gases to preheat $6,126 $15,784 - - $6,126
-
MMBtu
- -
09 2.6211: Conserve energy by efficient use of vending machines $331 $996 $331
9,471
kWh
- - - -
TOTAL RECOMMENDED $26,631 $34,602 $9,940
284,025
kWh
$5,651
-
kW-mo/yr
$8,939
-
MMBtu
$75 $2,026
TOTAL IMPLEMENTED $13,476 $13,590 $7,403
211,512
kWh
$4,938
-
kW-mo/yr
$1,034
-
MMBtu
$75 $26
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs