| Assessment Year | 2008 |
|---|---|
| Principal Product | Aluminium Extrusions |
| NAICS | 332321: Metal Window and Door Manufacturing |
| SIC | 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing |
| Sales Range | $100 M to 500M |
| # of Employees | 655 |
| Plant Area |
430,000
ft2
|
| Annual Production | 25,000,000
lb
|
| Production Hrs. Annual | 7,488
hrs
|
| Location (State) | Arkansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,137,765 | 24,002,112 |
kWh
|
$0.047 |
| Natural Gas | $1,083,147 | 113,427 |
MMBtu
|
$9.55 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $389,605 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $177,910 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Consumption Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7134: Use photocell controls | $959 | $398 |
$959
73
kWh
|
- | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,022 | $4,452 |
$2,022
219
kWh
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,704 | $17,980 |
$10,704
412
kWh
|
- | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $208 | $1,615 |
$208
18
kWh
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $441 | $2,703 |
$441
28
kWh
|
- | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,145 | $16,980 |
$2,145
137
kWh
|
- | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $463 | $2,027 |
$463
35
kWh
|
- | - | |
| 08 | 3.4159: Replace treated water with well / surface water | $12,550 | $152,330 | - | - |
$12,550
-
Tgal
|
|
| 09 | 2.2437: Recover waste heat from equipment | $11,400 | $7,484 | - |
$11,400
-
MMBtu
|
- | |
| 10 | 2.4221: Install compressor air intakes in coolest locations | $1,626 | $749 |
$1,626
121
kWh
|
- | - | |
| 11 | 2.2136: Install / repair insulation on steam lines | $16,897 | $1,517 |
$16,897
1,860
kWh
|
- | - | |
| 12 | 2.2622: Replace existing chiller with high efficiency model | $7,034 | $129,640 |
$7,034
545
kWh
|
- | - | |
| 13 | 2.2612: Use cooling tower water instead of refrigeration | $25,952 | $64,800 |
$25,952
1,993
kWh
|
- | - | |
| 14 | 2.4133: Use most efficient type of electric motors | $2,760 | $7,525 |
$2,760
236
kWh
|
- | - | |
| 15 | 2.1116: Improve combustion control capability | $131,460 | $41,080 | - |
$131,460
-
MMBtu
|
- | |
| 16 | 2.2437: Recover waste heat from equipment | $23,790 | $36,060 | - |
$23,790
-
MMBtu
|
- | |
| 17 | 3.4113: Treat and reuse rinse waters | $139,194 | $135,000 | - | - |
$139,194
-
Tgal
|
|
| TOTAL RECOMMENDED | $389,605 | $622,340 |
$71,211
5,677
kWh
|
$166,650
-
MMBtu
|
$151,744
-
Tgal
|
||
| TOTAL IMPLEMENTED | $177,910 | $261,025 |
$46,450
3,186
kWh
|
$131,460
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Consumption Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs