ITAC Assessment: OR0032
ITAC logo
ITAC Assessment: OR0032
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product LAMINATED WOOD
NAICS
n/a
SIC 2431: Millwork
Sales Range $1
M
to 5
M
# of Employees 42
Plant Area
n/a
Annual Production 3,000
thousand feet
Production Hrs. Annual 4,335
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $144,344 2,881,008
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,618 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,731

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Wood Savings Administrative Changes Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $1,763 - $1,763
36,049
kWh
- -
02 2.6212: Turn off equipment during breaks, reduce operating time $1,787 - $1,787
36,342
kWh
- -
03 2.2511: Insulate bare equipment $1,339 $629 $1,339
27,257
kWh
- -
04 2.8114: Change rate schedules or other changes in utility service $9,022 $5,200 $9,022
-
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $344 $280 $344
7,034
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $5,541 $4,798 $3,794
77,374
kWh
- $1,747
07 2.4221: Install compressor air intakes in coolest locations $438 $500 $438
9,086
kWh
- -
08 3.6123: Burn wood by-products for heat $23,425 $50,000 $26,501
541,032
kWh
$(-3,076.0)
-
MMBtu
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $38 $80 $38
586
kWh
- -
10 2.3212: Optimize plant power factor $1,921 $4,200 $1,921
-
kWh
- -
TOTAL RECOMMENDED $45,618 $65,687 $46,947
734,760
kWh
$(-3,076.0)
-
MMBtu
$1,747
TOTAL IMPLEMENTED $14,731 $6,689 $14,731
116,354
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Wood Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs