Assessment Year | 1988 |
---|---|
Principal Product | LAMINATED WOOD |
NAICS |
n/a
|
SIC | 2431: Millwork |
Sales Range | $1 M to 5M |
# of Employees | 42 |
Plant Area |
n/a
|
Annual Production | 3,000
thousand feet
|
Production Hrs. Annual | 4,335
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $144,344 | 2,881,008 |
kWh
|
$0.050 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $45,618 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,731 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Wood Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,763 | - |
$1,763
36,049
kWh
|
- | - | |
02 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,787 | - |
$1,787
36,342
kWh
|
- | - | |
03 | 2.2511: Insulate bare equipment | $1,339 | $629 |
$1,339
27,257
kWh
|
- | - | |
04 | 2.8114: Change rate schedules or other changes in utility service | $9,022 | $5,200 |
$9,022
-
kWh
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $344 | $280 |
$344
7,034
kWh
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,541 | $4,798 |
$3,794
77,374
kWh
|
- | $1,747 | |
07 | 2.4221: Install compressor air intakes in coolest locations | $438 | $500 |
$438
9,086
kWh
|
- | - | |
08 | 3.6123: Burn wood by-products for heat | $23,425 | $50,000 |
$26,501
541,032
kWh
|
$(-3,076.0)
-
MMBtu
|
- | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $38 | $80 |
$38
586
kWh
|
- | - | |
10 | 2.3212: Optimize plant power factor | $1,921 | $4,200 |
$1,921
-
kWh
|
- | - | |
TOTAL RECOMMENDED | $45,618 | $65,687 |
$46,947
734,760
kWh
|
$(-3,076.0)
-
MMBtu
|
$1,747 | ||
TOTAL IMPLEMENTED | $14,731 | $6,689 |
$14,731
116,354
kWh
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Wood Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs