Assessment Year | 2019 |
---|---|
Principal Product | Exhaust gas recirculation coolers and oil coolers |
NAICS | 336390: Other Motor Vehicle Parts Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $50 M to 100M |
# of Employees | 185 |
Plant Area |
115,000
ft2
|
Annual Production | 1,200,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $663,957 | 9,752,832 |
kWh
|
$0.068 | |
Electricity Demand | $329,184 | 23,568 |
kW-mo/yr
|
$13.97 | |
Natural Gas | $55,592 | 16,193 |
MMBtu
|
$3.43 | |
Waste Disposal Costs | |||||
Water Usage | $32,226 | 5,252,456 |
Tgal
|
$0.006 | |
TOTAL YEARLY COSTS | $1,080,959 | ||||
RECOMMENDED SAVINGS* | $85,655 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $13,552 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $4,249 | $7,200 | - | - |
$4,249
-
MMBtu
|
- | |
02 | 2.4221: Install compressor air intakes in coolest locations | $3,338 | $2,880 |
$2,581
37,954
kWh
|
$757
-
kW-mo/yr
|
- | - | |
03 | 4.132: Purchase new equipment to reduce material use / cost | $66,439 | $129,987 |
$(-8,935.0)
(-131,400)
kWh
|
$(-5,029.0)
-
kW-mo/yr
|
- | $80,403 | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $8,668 | $1,820 |
$7,383
110,189
kWh
|
$1,285
-
kW-mo/yr
|
- | - | |
05 | 2.2442: Preheat combustion air with waste heat | $1,415 | $7,000 | - | - |
$1,415
-
MMBtu
|
- | |
06 | 2.4227: Use compressor air filters | $1,546 | $360 |
$1,546
22,730
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $85,655 | $149,247 |
$2,575
39,473
kWh
|
$(-2,987.0)
-
kW-mo/yr
|
$5,664
-
MMBtu
|
$80,403 | ||
TOTAL IMPLEMENTED | $13,552 | $5,060 |
$11,510
170,873
kWh
|
$2,042
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs