ITAC Assessment: MZ0285
ITAC logo
ITAC Assessment: MZ0285
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Exhaust gas recirculation coolers and oil coolers
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 185
Plant Area 115,000
ft2
Annual Production 1,200,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $663,957 9,752,832
kWh
Electricity Demand $329,184 23,568
kW-mo/yr
Natural Gas $55,592 16,193
MMBtu
Waste Disposal Costs
Water Usage $32,226 5,252,456
Tgal
TOTAL YEARLY COSTS $1,080,959
RECOMMENDED SAVINGS* $85,655 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,552

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.2437: Recover waste heat from equipment $4,249 $7,200 - - $4,249
-
MMBtu
-
02 2.4221: Install compressor air intakes in coolest locations $3,338 $2,880 $2,581
37,954
kWh
$757
-
kW-mo/yr
- -
03 4.132: Purchase new equipment to reduce material use / cost $66,439 $129,987 $(-8,935.0)
(-131,400)
kWh
$(-5,029.0)
-
kW-mo/yr
- $80,403
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $8,668 $1,820 $7,383
110,189
kWh
$1,285
-
kW-mo/yr
- -
05 2.2442: Preheat combustion air with waste heat $1,415 $7,000 - - $1,415
-
MMBtu
-
06 2.4227: Use compressor air filters $1,546 $360 $1,546
22,730
kWh
- - -
TOTAL RECOMMENDED $85,655 $149,247 $2,575
39,473
kWh
$(-2,987.0)
-
kW-mo/yr
$5,664
-
MMBtu
$80,403
TOTAL IMPLEMENTED $13,552 $5,060 $11,510
170,873
kWh
$2,042
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs