ITAC Assessment: HO0080
ITAC logo
ITAC Assessment: HO0080
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Metallic Powders
NAICS
n/a
SIC 3399: Primary Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 87
Plant Area 109,000
ft2
Annual Production 8,200,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $543,958 6,256,741
kWh
Fuel Oil #4 $75,550 15,921
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $277,484 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,941

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Fuel Oil #4 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,503 $1,976 $2,503
28,722
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,842 $4,383 $1,842
21,102
kWh
- -
03 2.4133: Use most efficient type of electric motors $2,282 $2,977 $2,282
26,377
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $7,314 $1,500 $7,314
84,115
kWh
- -
05 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $263,543 $1,260,000 $440,040
5,061,548
kWh
$(-221,706.0)
-
MMBtu
$45,209
-
MMBtu
TOTAL RECOMMENDED $277,484 $1,270,836 $453,981
5,221,864
kWh
$(-221,706.0)
-
MMBtu
$45,209
-
MMBtu
TOTAL IMPLEMENTED $13,941 $10,836 $13,941
160,316
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs