Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

58

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Cheese manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SF0601 #07 Y:2023 Use waste heat from hot flue gases to preheat incoming fluids $12,826 $62,630
SF0601 #06 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $14,700 $12,525
SF0601 #05 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $5,103 $2,861
SF0601 #04 Y:2023 Use optimum thickness insulation $3,765 $1,482
SF0601 #03 Y:2023 Reduce the pressure of compressed air to the minimum required $402 $80
SF0601 #02 Y:2023 Use minimum steam operating pressure $1,168 $200
SF0601 #01 Y:2023 Turn off equipment when not in use $35,057 -
SF0519 #09 Y:2018 Recycle white water $16,021 $7,759
SF0519 #08 Y:2018 Use adjustable frequency drive or multiple speed motors on existing system $6,974 $34,820
SF0519 #07 Y:2018 Utilize higher efficiency lamps and/or ballasts $20,309 $55,280
SF0519 #06 Y:2018 Insulate bare equipment $9,168 $23,469
SF0519 #05 Y:2018 Use adjustable frequency drive or multiple speed motors on existing system $8,990 $19,331
SF0519 #04 Y:2018 Reduce space conditioning during non-working hours $2,597 $2,408
SF0519 #03 Y:2018 Modify refrigeration system to operate at a lower pressure $29,348 $20,000
SF0519 #02 Y:2018 Utilize energy-efficient belts and other improved mechanisms $376 $120
SF0519 #01 Y:2018 Eliminate leaks in inert gas and compressed air lines/ valves $1,215 $160
SF0487 #07 Y:2016 Install occupancy sensors $7,137 $27,407
SF0487 #06 Y:2016 Replace hydraulic / pneumatic equipment with electric equipment $3,794 $3,610
SF0487 #05 Y:2016 Utilize higher efficiency lamps and/or ballasts $18,738 $17,574
SF0487 #04 Y:2016 Use adjustable frequency drive or multiple speed motors on existing system $24,944 $11,650