58
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Cheese manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| SF0601 #07 Y:2023 | 07 | 2023 | Use waste heat from hot flue gases to preheat incoming fluids | $12,826 | $62,630 | |
| SF0601 #06 Y:2023 | 06 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $14,700 | $12,525 | |
| SF0601 #05 Y:2023 | 05 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $5,103 | $2,861 | |
| SF0601 #04 Y:2023 | 04 | 2023 | Use optimum thickness insulation | $3,765 | $1,482 | |
| SF0601 #03 Y:2023 | 03 | 2023 | Reduce the pressure of compressed air to the minimum required | $402 | $80 | |
| SF0601 #02 Y:2023 | 02 | 2023 | Use minimum steam operating pressure | $1,168 | $200 | |
| SF0601 #01 Y:2023 | 01 | 2023 | Turn off equipment when not in use | $35,057 | - | |
| SF0519 #09 Y:2018 | 09 | 2018 | Recycle white water | $16,021 | $7,759 | |
| SF0519 #08 Y:2018 | 08 | 2018 | Use adjustable frequency drive or multiple speed motors on existing system | $6,974 | $34,820 | |
| SF0519 #07 Y:2018 | 07 | 2018 | Utilize higher efficiency lamps and/or ballasts | $20,309 | $55,280 | |
| SF0519 #06 Y:2018 | 06 | 2018 | Insulate bare equipment | $9,168 | $23,469 | |
| SF0519 #05 Y:2018 | 05 | 2018 | Use adjustable frequency drive or multiple speed motors on existing system | $8,990 | $19,331 | |
| SF0519 #04 Y:2018 | 04 | 2018 | Reduce space conditioning during non-working hours | $2,597 | $2,408 | |
| SF0519 #03 Y:2018 | 03 | 2018 | Modify refrigeration system to operate at a lower pressure | $29,348 | $20,000 | |
| SF0519 #02 Y:2018 | 02 | 2018 | Utilize energy-efficient belts and other improved mechanisms | $376 | $120 | |
| SF0519 #01 Y:2018 | 01 | 2018 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,215 | $160 | |
| SF0487 #07 Y:2016 | 07 | 2016 | Install occupancy sensors | $7,137 | $27,407 | |
| SF0487 #06 Y:2016 | 06 | 2016 | Replace hydraulic / pneumatic equipment with electric equipment | $3,794 | $3,610 | |
| SF0487 #05 Y:2016 | 05 | 2016 | Utilize higher efficiency lamps and/or ballasts | $18,738 | $17,574 | |
| SF0487 #04 Y:2016 | 04 | 2016 | Use adjustable frequency drive or multiple speed motors on existing system | $24,944 | $11,650 |