ITAC Assessment: SF0519
ITAC logo
ITAC Assessment: SF0519
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Cheese, Whey and Yogurt
NAICS 311513: Cheese Manufacturing
SIC 2022: Natural, Processed, and Imitation Cheese
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 133,000
ft2
Annual Production 45,000,000
units
Production Hrs. Annual 4,420
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $652,224 8,178,615
kWh
Electricity Demand $363,741 20,460
kW-mo/yr
Natural Gas $402,893 65,093
MMBtu
TOTAL YEARLY COSTS $1,418,858
RECOMMENDED SAVINGS* $94,998 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,168

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,215 $160 $1,215
15,238
kWh
- - - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $376 $120 $288
3,606
kWh
$88
-
kW-mo/yr
- - -
03 2.2621: Modify refrigeration system to operate at a lower pressure $29,348 $20,000 $29,348
367,997
kWh
- - - -
04 2.7224: Reduce space conditioning during non-working hours $2,597 $2,408 $290
3,641
kWh
- $2,307
-
MMBtu
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,990 $19,331 $8,990
112,723
kWh
- - - -
06 2.2511: Insulate bare equipment $9,168 $23,469 - - $9,168
-
MMBtu
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $20,309 $55,280 $14,459
181,192
kWh
$5,850
-
kW-mo/yr
- - -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,974 $34,820 $6,974
87,453
kWh
- - - -
09 3.5131: Recycle white water $16,021 $7,759 $(-141.0)
(-1,766)
kWh
$(-227.0)
-
kW-mo/yr
- $6,166
-
Tgal
$10,223
-
Tgal
TOTAL RECOMMENDED $94,998 $163,347 $61,423
770,084
kWh
$5,711
-
kW-mo/yr
$11,475
-
MMBtu
$6,166
-
Tgal
$10,223
-
Tgal
TOTAL IMPLEMENTED $9,168 $23,469 - - $9,168
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs