Assessment Year | 2018 |
---|---|
Principal Product | Cheese, Whey and Yogurt |
NAICS | 311513: Cheese Manufacturing |
SIC | 2022: Natural, Processed, and Imitation Cheese |
Sales Range | $50 M to 100M |
# of Employees | 200 |
Plant Area |
133,000
ft2
|
Annual Production | 45,000,000
units
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $652,224 | 8,178,615 |
kWh
|
$0.080 |
Electricity Demand | $363,741 | 20,460 |
kW-mo/yr
|
$17.78 |
Natural Gas | $402,893 | 65,093 |
MMBtu
|
$6.19 |
TOTAL YEARLY COSTS | $1,418,858 | |||
RECOMMENDED SAVINGS* | $94,998 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,168 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,215 | $160 |
$1,215
15,238
kWh
|
- | - | - | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $376 | $120 |
$288
3,606
kWh
|
$88
-
kW-mo/yr
|
- | - | - | |
03 | 2.2621: Modify refrigeration system to operate at a lower pressure | $29,348 | $20,000 |
$29,348
367,997
kWh
|
- | - | - | - | |
04 | 2.7224: Reduce space conditioning during non-working hours | $2,597 | $2,408 |
$290
3,641
kWh
|
- |
$2,307
-
MMBtu
|
- | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,990 | $19,331 |
$8,990
112,723
kWh
|
- | - | - | - | |
06 | 2.2511: Insulate bare equipment | $9,168 | $23,469 | - | - |
$9,168
-
MMBtu
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $20,309 | $55,280 |
$14,459
181,192
kWh
|
$5,850
-
kW-mo/yr
|
- | - | - | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,974 | $34,820 |
$6,974
87,453
kWh
|
- | - | - | - | |
09 | 3.5131: Recycle white water | $16,021 | $7,759 |
$(-141.0)
(-1,766)
kWh
|
$(-227.0)
-
kW-mo/yr
|
- |
$6,166
-
Tgal
|
$10,223
-
Tgal
|
|
TOTAL RECOMMENDED | $94,998 | $163,347 |
$61,423
770,084
kWh
|
$5,711
-
kW-mo/yr
|
$11,475
-
MMBtu
|
$6,166
-
Tgal
|
$10,223
-
Tgal
|
||
TOTAL IMPLEMENTED | $9,168 | $23,469 | - | - |
$9,168
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs