ITAC Assessment: SD0465
ITAC logo
ITAC Assessment: SD0465
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product tortillas
NAICS 311830: Tortilla Manufacturing
SIC 2041: Flour and Other Grain Mill Products
Sales Range $10
M
to 50
M
# of Employees 136
Plant Area 75,000
ft2
Annual Production 150,000,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $175,945 2,444,404
kWh
Electricity Demand $81,503 5,829
kW-mo/yr
Electricity Fees $12,795 -
Natural Gas $81,947 14,797
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,336 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,731

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4134: Replace electric motor with fossil fuel engine $18,166 $60,710 $30,688
426,222
kWh
$14,324
-
kW-mo/yr
$(-26,846.0)
-
MMBtu
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $16,606 $29,550 $17,276
239,937
kWh
$5,375
-
kW-mo/yr
$(-6,045.0)
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,054 $2,000 $3,732
51,836
kWh
$2,322
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,677 $200 $1,677
23,289
kWh
- -
05 2.7135: Install occupancy sensors $1,318 $1,521 $1,318
18,303
kWh
- -
06 2.4226: Use / purchase optimum sized compressor $1,113 $200 $849
11,796
kWh
$264
-
kW-mo/yr
-
07 2.7134: Use photocell controls $402 $1,100 $307
4,262
kWh
$95
-
kW-mo/yr
-
TOTAL RECOMMENDED $45,336 $95,281 $55,847
775,645
kWh
$22,380
-
kW-mo/yr
$(-32,891.0)
-
MMBtu
TOTAL IMPLEMENTED $7,731 $2,200 $5,409
75,125
kWh
$2,322
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs