| Assessment Year | 2016 |
|---|---|
| Principal Product | Lactose and Whey Protein |
| NAICS | 311513: Cheese Manufacturing |
| SIC | 2022: Natural, Processed, and Imitation Cheese |
| Sales Range | $10 M to 50M |
| # of Employees | 58 |
| Plant Area |
250,000
ft2
|
| Annual Production | 74,000
ton
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,899,531 | 24,338,244 |
kWh
|
$0.078 |
| Electricity Demand | $633,724 | 39,276 |
kW-mo/yr
|
$16.14 |
| TOTAL YEARLY COSTS | $2,533,255 | |||
| RECOMMENDED SAVINGS* | $75,646 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $24,094 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7224: Reduce space conditioning during non-working hours | $5,356 | - |
$3,489
44,690
kWh
|
- |
$1,867
-
MMBtu
|
- | - | |
| 02 | 2.6212: Turn off equipment during breaks, reduce operating time | $13,545 | - |
$10,556
135,208
kWh
|
$2,989
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.2511: Insulate bare equipment | $2,132 | $534 | - | - |
$2,132
-
MMBtu
|
- | - | |
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $24,944 | $11,650 |
$24,944
319,507
kWh
|
- | - | - | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $18,738 | $17,574 |
$15,361
196,763
kWh
|
$4,130
-
kW-mo/yr
|
- | $635 | $(-1,388.0) | |
| 06 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $3,794 | $3,610 |
$3,794
48,596
kWh
|
- | - | - | - | |
| 07 | 2.7135: Install occupancy sensors | $7,137 | $27,407 |
$5,891
75,454
kWh
|
$1,246
-
kW-mo/yr
|
- | - | - | |
| TOTAL RECOMMENDED | $75,646 | $60,775 |
$64,035
820,218
kWh
|
$8,365
-
kW-mo/yr
|
$3,999
-
MMBtu
|
$635 | $(-1,388.0) | ||
| TOTAL IMPLEMENTED | $24,094 | $17,574 |
$18,850
241,453
kWh
|
$4,130
-
kW-mo/yr
|
$1,867
-
MMBtu
|
$635 | $(-1,388.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs