ITAC Assessment: SF0601
ITAC logo
ITAC Assessment: SF0601
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Goat Cheese
NAICS 311513: Cheese Manufacturing
SIC 2022: Natural, Processed, and Imitation Cheese
Sales Range $10
M
to 50
M
# of Employees 72
Plant Area 24,000
ft2
Annual Production 1,800,000
lb
Production Hrs. Annual 2,652
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,869 293,942
kWh
Electricity Demand $95,965 2,620
kW-mo/yr
Electricity Fees $2,186 -
Natural Gas $101,713 5,859
MMBtu
TOTAL YEARLY COSTS $254,733
RECOMMENDED SAVINGS* $73,021 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $53,522

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $35,057 - $26,354
141,157
kWh
$8,703
-
kW-mo/yr
-
02 2.2163: Use minimum steam operating pressure $1,168 $200 - - $1,168
-
MMBtu
03 2.4231: Reduce the pressure of compressed air to the minimum required $402 $80 $314
1,680
kWh
$88
-
kW-mo/yr
-
04 2.2515: Use optimum thickness insulation $3,765 $1,482 - - $3,765
-
MMBtu
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,103 $2,861 $5,103
27,335
kWh
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,700 $12,525 $14,700
78,736
kWh
- -
07 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $12,826 $62,630 - - $12,826
-
MMBtu
TOTAL RECOMMENDED $73,021 $79,778 $46,471
248,908
kWh
$8,791
-
kW-mo/yr
$17,759
-
MMBtu
TOTAL IMPLEMENTED $53,522 $14,007 $41,054
219,893
kWh
$8,703
-
kW-mo/yr
$3,765
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs