Assessment Year | 2023 |
---|---|
Principal Product | Goat Cheese |
NAICS | 311513: Cheese Manufacturing |
SIC | 2022: Natural, Processed, and Imitation Cheese |
Sales Range | $10 M to 50M |
# of Employees | 72 |
Plant Area |
24,000
ft2
|
Annual Production | 1,800,000
lb
|
Production Hrs. Annual | 2,652
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $54,869 | 293,942 |
kWh
|
$0.19 |
Electricity Demand | $95,965 | 2,620 |
kW-mo/yr
|
$36.63 |
Electricity Fees | $2,186 | - |
|
- |
Natural Gas | $101,713 | 5,859 |
MMBtu
|
$17.36 |
TOTAL YEARLY COSTS | $254,733 | |||
RECOMMENDED SAVINGS* | $73,021 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $53,522 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $35,057 | - |
$26,354
141,157
kWh
|
$8,703
-
kW-mo/yr
|
- | |
02 | 2.2163: Use minimum steam operating pressure | $1,168 | $200 | - | - |
$1,168
-
MMBtu
|
|
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $402 | $80 |
$314
1,680
kWh
|
$88
-
kW-mo/yr
|
- | |
04 | 2.2515: Use optimum thickness insulation | $3,765 | $1,482 | - | - |
$3,765
-
MMBtu
|
|
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,103 | $2,861 |
$5,103
27,335
kWh
|
- | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $14,700 | $12,525 |
$14,700
78,736
kWh
|
- | - | |
07 | 2.2427: Use waste heat from hot flue gases to preheat incoming fluids | $12,826 | $62,630 | - | - |
$12,826
-
MMBtu
|
|
TOTAL RECOMMENDED | $73,021 | $79,778 |
$46,471
248,908
kWh
|
$8,791
-
kW-mo/yr
|
$17,759
-
MMBtu
|
||
TOTAL IMPLEMENTED | $53,522 | $14,007 |
$41,054
219,893
kWh
|
$8,703
-
kW-mo/yr
|
$3,765
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs