ITAC Assessment: MS0302
ITAC logo
ITAC Assessment: MS0302
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Lumber
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 97
Plant Area 40,000
ft2
Annual Production 25,000,000
units
Production Hrs. Annual 2,340
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $287,533 3,439,356
kWh
Electricity Demand $62,614 19,416
kW-mo/yr
Electricity Fees $272,552 -
Natural Gas $57,194 3,989
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $862,394 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,520

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
01 2.3414: Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat $843,874 $1,350,000 $287,533
10,643,400
kWh
$62,614
-
kW-mo/yr
$5,192 $488,535
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $8,236 $21,060 $6,006
115,437
kWh
$2,224
-
kW-mo/yr
$6 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,643 $6,087 $4,214
97,192
kWh
$425
-
kW-mo/yr
$4 -
04 2.7111: Reduce illumination to minimum necessary levels $3,406 - $3,403
78,432
kWh
- $3 -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,297 $5,159 $1,146
26,444
kWh
$150
-
kW-mo/yr
$1 -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $938 $156 $937
21,624
kWh
- $1 -
TOTAL RECOMMENDED $862,394 $1,382,462 $303,239
10,982,529
kWh
$65,413
-
kW-mo/yr
$5,207 $488,535
TOTAL IMPLEMENTED $18,520 $32,462 $15,706
339,129
kWh
$2,799
-
kW-mo/yr
$15 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs