930
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
UU0285 #10 Y:2025 | 10 | 2025 | Install occupancy sensors | $3,820 | $17,670 |
n/a
|
UU0285 #09 Y:2025 | 09 | 2025 | Utilize higher efficiency lamps and/or ballasts | $8,110 | $41,570 |
n/a
|
UU0285 #08 Y:2025 | 08 | 2025 | Pay bills on time to avoid late fees | $694 | $720 |
n/a
|
UU0285 #07 Y:2025 | 07 | 2025 | Reduce fluid flow rates | $2,210 | $30,850 |
n/a
|
UU0285 #06 Y:2025 | 06 | 2025 | Eliminate or reduce compressed air usage | $2,160 | $1,440 |
n/a
|
UU0285 #05 Y:2025 | 05 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,700 | $2,950 |
n/a
|
UU0285 #04 Y:2025 | 04 | 2025 | Install common header on compressors | $23,050 | $394,000 |
n/a
|
UU0285 #03 Y:2025 | 03 | 2025 | Use optimum size and capacity equipment | $1,950 | $24,760 |
n/a
|
UU0285 #02 Y:2025 | 02 | 2025 | Eliminate or reduce compressed air usage | $1,860 | $400 |
n/a
|
UU0285 #01 Y:2025 | 01 | 2025 | Use solar heat to make electricty | $31,860 | $229,735 |
n/a
|
UU0264 #11 Y:2024 | 11 | 2024 | Replace fossil fuel equipment with electrical equipment | $44,506 | $432,000 | |
UU0264 #10 Y:2024 | 10 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $515 | $916 | |
UU0264 #09 Y:2024 | 09 | 2024 | Use solar heat to make electricty | $44,517 | $717,537 | |
UU0264 #08 Y:2024 | 08 | 2024 | Install occupancy sensors | $538 | $1,531 | |
UU0264 #07 Y:2024 | 07 | 2024 | Utilize higher efficiency lamps and/or ballasts | $4,405 | $8,915 | |
UU0264 #06 Y:2024 | 06 | 2024 | Eliminate or reduce compressed air usage | $1,905 | $7,317 | |
UU0264 #05 Y:2024 | 05 | 2024 | Upgrade controls on compressors | $3,332 | $4,000 | |
UU0264 #04 Y:2024 | 04 | 2024 | Replace boiler | $379,077 | $4,080,441 | |
UU0264 #03 Y:2024 | 03 | 2024 | Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $729,671 | $3,645,455 | |
UU0264 #02 Y:2024 | 02 | 2024 | Preheat boiler makeup water with waste process heat | $215,672 | $730,950 |