921
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
UU0264 #11 Y:2024 | 11 | 2024 | Replace fossil fuel equipment with electrical equipment | $44,506 | $432,000 |
n/a
|
UU0264 #10 Y:2024 | 10 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $515 | $916 |
n/a
|
UU0264 #09 Y:2024 | 09 | 2024 | Use solar heat to make electricty | $44,517 | $717,537 |
n/a
|
UU0264 #08 Y:2024 | 08 | 2024 | Install occupancy sensors | $538 | $1,531 |
n/a
|
UU0264 #07 Y:2024 | 07 | 2024 | Utilize higher efficiency lamps and/or ballasts | $4,405 | $8,915 |
n/a
|
UU0264 #06 Y:2024 | 06 | 2024 | Eliminate or reduce compressed air usage | $1,905 | $7,317 |
n/a
|
UU0264 #05 Y:2024 | 05 | 2024 | Upgrade controls on compressors | $3,332 | $4,000 |
n/a
|
UU0264 #04 Y:2024 | 04 | 2024 | Replace boiler | $379,077 | $4,080,441 |
n/a
|
UU0264 #03 Y:2024 | 03 | 2024 | Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $729,671 | $3,645,455 |
n/a
|
UU0264 #02 Y:2024 | 02 | 2024 | Preheat boiler makeup water with waste process heat | $215,672 | $730,950 |
n/a
|
UU0264 #01 Y:2024 | 01 | 2024 | Install automatic boiler fuel feed system | $79,422 | $143,652 |
n/a
|
OR0802 #05 Y:2024 | 05 | 2024 | Install smaller boiler (increase high fire duty cycle) | $24,088 | $10,281 |
n/a
|
OR0802 #04 Y:2024 | 04 | 2024 | Insulate bare equipment | $1,009 | $280 |
n/a
|
OR0802 #03 Y:2024 | 03 | 2024 | Reduce the pressure of compressed air to the minimum required | $1,482 | $499 |
n/a
|
OR0802 #02 Y:2024 | 02 | 2024 | Eliminate or reduce compressed air usage | $1,248 | $147 |
n/a
|
OR0802 #01 Y:2024 | 01 | 2024 | Eliminate or reduce compressed air usage | $50,020 | $5,000 |
n/a
|
AS0590 #05 Y:2024 | 05 | 2024 | Reduce heat gain by window tinting | $196 | $299 |
n/a
|
AS0590 #04 Y:2024 | 04 | 2024 | Utilize higher efficiency lamps and/or ballasts | $1,358 | $1,128 |
n/a
|
AS0590 #03 Y:2024 | 03 | 2024 | Pay bills on time to avoid late fees | $3,038 | $39 |
n/a
|
AS0590 #02 Y:2024 | 02 | 2024 | Use solar heat to make electricty | $17,979 | $93,198 |
n/a
|