Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

959

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Fruit and vegetable canning, pickling, and drying
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UL2614 #08 Y:2026 Eliminate or reduce compressed air usage $474 $403
UL2614 #07 Y:2026 Use waste heat from hot flue gases to preheat $9,873 $32,500
UL2614 #06 Y:2026 Use solar heat to make electricty $15,745 $220,724
UL2614 #05 Y:2026 Optimize plant power factor $3,431 $7,370
UL2614 #04 Y:2026 Install / repair insulation on steam lines $2,638 $2,392
UL2614 #03 Y:2026 Use outside cold water source as a supply of cooling water $13,075 $57,069
UL2614 #02 Y:2026 Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $569 $350
UL2614 #01 Y:2026 Utilize higher efficiency lamps and/or ballasts $292 $91
SF0650 #06 Y:2026 Use small number of high output units instead of many small inefficient units $49,737 $264,253
SF0650 #05 Y:2026 Recover waste heat from equipment $4,412 $16,375
SF0650 #04 Y:2026 Change rate schedules or other changes in utility service $137,573 $305,377
SF0650 #03 Y:2026 Use minimum steam operating pressure $2,009 $1,080
SF0650 #02 Y:2026 Reduce the pressure of compressed air to the minimum required $6,329 $160
SF0650 #01 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $49,625 -
OR0826 #05 Y:2026 Install common header on compressors $3,389 $17,947
OR0826 #04 Y:2026 Use heat from boiler blowdown to preheat boiler feed water $1,494 $6,047
OR0826 #03 Y:2026 Optimize plant power factor $13,756 $35,271
OR0826 #02 Y:2026 Insulate bare equipment $3,164 $698
OR0826 #01 Y:2026 Pay utility bills on time $3,568 -
MI0469 #07 Y:2025 Replace existing hvac unit with high efficiency model $10,559 $51,800