Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Frozen fruit, juice, and vegetable manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MI0327 #09 Y:2017 Make a practice of turning off lights when not needed $268 $40
MI0327 #08 Y:2017 Lower temperature during the winter season and vice-versa $1,910 $40
MI0327 #07 Y:2017 Use utility controlled power management $2,349 $80
MI0327 #06 Y:2017 Utilize higher efficiency lamps and/or ballasts $3,001 $8,193
MI0327 #05 Y:2017 Increase amount of waste recovered for resale $3,036 $11,400
MI0327 #04 Y:2017 Install vinyl strip / high speed / air curtain doors $3,743 $520
MI0327 #03 Y:2017 Install vinyl strip / high speed / air curtain doors $5,990 $7,485
MI0327 #02 Y:2017 Turn off equipment when not in use $12,641 $3,600
MI0327 #01 Y:2017 Utilize a less expensive cooling method $14,286 $68,000
SF0513 #05 Y:2017 Replace existing chiller with high efficiency model $64,975 $191,474
SF0513 #04 Y:2017 Use adjustable frequency drive or multiple speed motors on existing system $5,395 $10,091
SF0513 #03 Y:2017 Lower light fixtures in high ceiling areas $66,148 $67,793
SF0513 #02 Y:2017 Modify refrigeration system to operate at a lower pressure $177,909 $41,250
SF0513 #01 Y:2017 Turn off equipment when not in use $6,923 -
OR0694 #06 Y:2017 Minimize water usage $8,079 $15,125
OR0694 #05 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $9,605 $10,606
OR0694 #04 Y:2017 Install equipment (eg compactor) to reduce disposal costs $29,962 $12,100
OR0694 #03 Y:2017 Install back-up equipment $219,130 $45,000
OR0694 #02 Y:2017 Begin a practice of predictive / preventative maintenance $78,503 $7,018
OR0694 #01 Y:2017 Add equipment/ operators to reduce production bottleneck $190,250 $7,842