Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

458

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Frozen fruit, juice, and vegetable manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
BS0049 #01 Y:2015 Minimize operation of equipment maintained in standby condition $394,723 $180,080
MI0263 #13 Y:2014 Lower temperature during the winter season and vice-versa $409 $173
MI0263 #12 Y:2014 Insulate bare equipment $708 $280
MI0263 #11 Y:2014 Reduce the pressure of compressed air to the minimum required $1,317 $80
MI0263 #10 Y:2014 Use optimum thickness insulation $1,375 $360
MI0263 #09 Y:2014 Eliminate leaks in inert gas and compressed air lines/ valves $1,472 $1,660
MI0263 #08 Y:2014 Install occupancy sensors $1,643 $497
MI0263 #07 Y:2014 Utilize higher efficiency lamps and/or ballasts $2,377 $10,770
MI0263 #06 Y:2014 Meter recycled water (to reduce sewer charges) $3,052 $560
MI0263 #05 Y:2014 Use cooling tower or economizer to replace chiller cooling $4,131 $4,980
MI0263 #04 Y:2014 Heat water with exhaust heat $6,564 $8,859
MI0263 #03 Y:2014 Use waste heat from hot flue gases to preheat $13,762 $28,000
MI0263 #02 Y:2014 Turn off equipment when not in use $11,051 $500
MI0263 #01 Y:2014 Turn off equipment when not in use $23,147 $3,600
OR0626 #07 Y:2013 Utilize higher efficiency lamps and/or ballasts $3,463 $3,437
OR0626 #06 Y:2013 Insulate bare equipment $3,138 $5,659
OR0626 #05 Y:2013 Recover heat from exhausted steam, hot air or hot water $5,445 $6,461
OR0626 #04 Y:2013 Upgrade controls on compressors $7,138 $5,500
OR0626 #03 Y:2013 Improve combustion control capability $11,422 $7,219
OR0626 #02 Y:2013 Reduce the pressure of compressed air to the minimum required $1,945 $1,000