ITAC Assessment: BS0049
ITAC logo
ITAC Assessment: BS0049
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Potatoes
NAICS 311411: Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $100
M
to 500
M
# of Employees 657
Plant Area 332,800
ft2
Annual Production 339,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $4,449,694 90,672,845
kWh
Electricity Demand $1,214,572 219,462
kW-mo/yr
Electricity Fees $125,840 -
Natural Gas $4,932,674 1,014,310
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $644,168 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Water Consumption Savings By-product Production Savings
01 2.6242: Minimize operation of equipment maintained in standby condition $394,723 $180,080 - - $394,723
-
MMBtu
- - -
02 2.2626: Avoid frost formation on evaporators $102,865 $70,430 $(-18,956.6)
(-386,318)
kWh
- $22,436
-
MMBtu
$86,238
-
Tgal
$13,147
-
Tgal
-
03 2.1336: Install equipment to utilize waste fuel $63,716 $137,445 - - - - - $63,716
04 2.4221: Install compressor air intakes in coolest locations $41,557 $1,388 $35,874
731,068
kWh
$5,683
-
kW-mo/yr
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $26,049 $65,491 $22,563
459,812
kWh
$3,486
-
kW-mo/yr
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $4,745 $19,475 $4,170
84,972
kWh
$575
-
kW-mo/yr
- - - -
07 2.7135: Install occupancy sensors $6,168 $801 $6,168
125,706
kWh
- - - - -
08 2.4133: Use most efficient type of electric motors $2,284 $7,380 $2,002
40,810
kWh
$282
-
kW-mo/yr
- - - -
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,061 $624 $2,061
41,992
kWh
- - - - -
TOTAL RECOMMENDED $644,168 $483,114 $53,881
1,098,042
kWh
$10,026
-
kW-mo/yr
$417,159
-
MMBtu
$86,238
-
Tgal
$13,147
-
Tgal
$63,716
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Water Consumption Savings By-product Production Savings