Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

451

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Frozen fruit, juice, and vegetable manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0694 #05 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $9,605 $10,606
OR0694 #04 Y:2017 Install equipment (eg compactor) to reduce disposal costs $29,962 $12,100
OR0694 #03 Y:2017 Install back-up equipment $219,130 $45,000
OR0694 #02 Y:2017 Begin a practice of predictive / preventative maintenance $78,503 $7,018
OR0694 #01 Y:2017 Add equipment/ operators to reduce production bottleneck $190,250 $7,842
BS0049 #09 Y:2015 Utilize energy-efficient belts and other improved mechanisms $2,061 $624
BS0049 #08 Y:2015 Use most efficient type of electric motors $2,284 $7,380
BS0049 #07 Y:2015 Install occupancy sensors $6,168 $801
BS0049 #06 Y:2015 Utilize higher efficiency lamps and/or ballasts $4,745 $19,475
BS0049 #05 Y:2015 Utilize higher efficiency lamps and/or ballasts $26,049 $65,491
BS0049 #04 Y:2015 Install compressor air intakes in coolest locations $41,557 $1,388
BS0049 #03 Y:2015 Install equipment to utilize waste fuel $63,716 $137,445
BS0049 #02 Y:2015 Avoid frost formation on evaporators $102,865 $70,430
BS0049 #01 Y:2015 Minimize operation of equipment maintained in standby condition $394,723 $180,080
MI0263 #13 Y:2014 Lower temperature during the winter season and vice-versa $409 $173
MI0263 #12 Y:2014 Insulate bare equipment $708 $280
MI0263 #11 Y:2014 Reduce the pressure of compressed air to the minimum required $1,317 $80
MI0263 #10 Y:2014 Use optimum thickness insulation $1,375 $360
MI0263 #09 Y:2014 Eliminate leaks in inert gas and compressed air lines/ valves $1,472 $1,660
MI0263 #08 Y:2014 Install occupancy sensors $1,643 $497