Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

451

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Frozen fruit, juice, and vegetable manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MI0356 #08 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $7,569 $2,020
MI0356 #07 Y:2019 Analyze flue gas for proper air/fuel ratio $8,181 $2,320
MI0356 #06 Y:2019 Lower temperature during the winter season and vice-versa $8,814 $480
MI0356 #05 Y:2019 Reduce excessive boiler blowdown $10,928 $8,500
MI0356 #04 Y:2019 Use waste heat from hot flue gases to preheat $17,171 $24,418
MI0356 #03 Y:2019 Use adjustable frequency drive or multiple speed motors on existing system $25,615 $19,558
MI0356 #02 Y:2019 Use adjustable frequency drive or multiple speed motors on existing system $28,750 $42,002
MI0356 #01 Y:2019 Replace treated water with well / surface water $68,283 $118,050
BS0118 #07 Y:2018 Re-size charging openings or add movable cover or door $10,186 $790
BS0118 #06 Y:2018 Eliminate leaks in inert gas and compressed air lines/ valves $545 $210
BS0118 #05 Y:2018 Install compressor air intakes in coolest locations $821 $275
BS0118 #04 Y:2018 Install occupancy sensors $1,313 $760
BS0118 #03 Y:2018 Utilize energy-efficient belts and other improved mechanisms $257 $30
BS0118 #02 Y:2018 Insulate bare equipment $616 $960
BS0118 #01 Y:2018 Reduce the pressure of compressed air to the minimum required $2,275 $20
UF0521 #10 Y:2018 Make a new by-product $243,164 $58,810
UF0521 #09 Y:2018 Re-arrange equipment layout to reduce handling costs $39,645 $66,000
UF0521 #08 Y:2018 Install occupancy sensors $1,160 $1,149
UF0521 #07 Y:2018 Reduce the pressure of compressed air to the minimum required $1,356 -
UF0521 #06 Y:2018 Improve combustion control capability $3,586 $2,800