Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

451

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Frozen fruit, juice, and vegetable manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
BS0146 #05 Y:2021 Upgrade conveyors $1,386 $1,888
BS0146 #04 Y:2021 Reduce space conditioning during non-working hours $992 $159
BS0146 #03 Y:2021 Install occupancy sensors $622 $1,174
BS0146 #02 Y:2021 Use most efficient type of electric motors $7,336 $5,040
BS0146 #01 Y:2021 Install vinyl strip / high speed / air curtain doors $1,004 $1,690
MI0386 #06 Y:2021 Insulate bare equipment $1,002 $1,484
MI0386 #05 Y:2021 Recharge batteries on during off-peak demand periods $1,559 $1,827
MI0386 #04 Y:2021 Use heat from boiler blowdown to preheat boiler feed water $6,129 $15,000
MI0386 #03 Y:2021 Use solar heat to heat water $10,324 $48,514
MI0386 #02 Y:2021 Replace existing hvac unit with high efficiency model $19,620 $43,782
MI0386 #01 Y:2021 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $247,190 $742,500
SF0554 #10 Y:2020 Install vinyl strip / high speed / air curtain doors $2,351 $5,888
SF0554 #09 Y:2020 Replace hydraulic / pneumatic equipment with electric equipment $632 $1,312
SF0554 #08 Y:2020 Reduce the pressure of compressed air to the minimum required $833 $1,245
SF0554 #07 Y:2020 Recharge batteries on during off-peak demand periods $871 $1,184
SF0554 #06 Y:2020 Insulate bare equipment $1,140 $1,577
SF0554 #05 Y:2020 Utilize higher efficiency lamps and/or ballasts $10,099 $13,511
SF0554 #04 Y:2020 Install vinyl strip / high speed / air curtain doors $4,802 $5,638
SF0554 #03 Y:2020 Insulate bare equipment $386 $404
SF0554 #02 Y:2020 Use heat exchange fluids instead of steam in pipeline tracing systems $21,879 $20,311