ITAC Assessment: BS0146
ITAC logo
ITAC Assessment: BS0146
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Specialty potato products
NAICS 311411: Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $10
M
to 50
M
# of Employees 171
Plant Area 110,000
ft2
Annual Production 18,500,000
lb
Production Hrs. Annual 7,512
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $295,498 6,449,638
kWh
Electricity Demand $122,951 22,718
kW-mo/yr
Electricity Fees $20,934 -
Natural Gas $128,538 37,863
MMBtu
Waste Disposal Costs
Water Disposal $100,000 1,900,740
Tgal
TOTAL YEARLY COSTS $667,921
RECOMMENDED SAVINGS* $12,026 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $1,004 $1,690 $1,004
21,918
kWh
- -
02 2.4133: Use most efficient type of electric motors $7,336 $5,040 $7,336
160,101
kWh
- -
03 2.7135: Install occupancy sensors $622 $1,174 $622
13,578
kWh
- -
04 2.7224: Reduce space conditioning during non-working hours $992 $159 $319
6,972
kWh
- $673
-
MMBtu
05 2.4325: Upgrade conveyors $1,386 $1,888 $1,386
30,249
kWh
- -
06 2.4322: Use or replace with energy efficient substitutes $686 $972 $555
12,120
kWh
$131
-
kW-mo/yr
-
TOTAL RECOMMENDED $12,026 $10,923 $11,222
244,938
kWh
$131
-
kW-mo/yr
$673
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs