ITAC Assessment: MI0386
ITAC logo
ITAC Assessment: MI0386
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Fruit Concentrates
NAICS 311411: Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $100
M
to 500
M
# of Employees 125
Plant Area 350,000
ft2
Annual Production 15,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $453,646 8,882,442
kWh
Electricity Demand $306,977 39,773
kW-mo/yr
Electricity Fees $12,884 -
Natural Gas $266,579 182,154
MMBtu
TOTAL YEARLY COSTS $1,040,086
RECOMMENDED SAVINGS* $285,824 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,308

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $247,190 $742,500 $229,500
4,500,000
kWh
$69,462
-
kW-mo/yr
$(-51,772.0)
-
MMBtu
02 2.7232: Replace existing hvac unit with high efficiency model $19,620 $43,782 $15,993
313,586
kWh
$3,627
-
kW-mo/yr
-
03 2.9112: Use solar heat to heat water $10,324 $48,514 - - $10,324
-
MMBtu
04 2.1243: Use heat from boiler blowdown to preheat boiler feed water $6,129 $15,000 - - $6,129
-
MMBtu
05 2.3132: Recharge batteries on during off-peak demand periods $1,559 $1,827 - $1,559
-
kW-mo/yr
-
06 2.2511: Insulate bare equipment $1,002 $1,484 $770
15,093
kWh
$232
-
kW-mo/yr
-
TOTAL RECOMMENDED $285,824 $853,107 $246,263
4,828,679
kWh
$74,880
-
kW-mo/yr
$(-35,319.0)
-
MMBtu
TOTAL IMPLEMENTED $27,308 $60,609 $15,993
313,586
kWh
$5,186
-
kW-mo/yr
$6,129
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs