Assessment Year | 2021 |
---|---|
Principal Product | Fruit Concentrates |
NAICS | 311411: Frozen Fruit, Juice, and Vegetable Manufacturing |
SIC | 2037: Frozen Fruits, Fruit Juices, and Vegetables |
Sales Range | $100 M to 500M |
# of Employees | 125 |
Plant Area |
350,000
ft2
|
Annual Production | 15,000,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $453,646 | 8,882,442 |
kWh
|
$0.051 |
Electricity Demand | $306,977 | 39,773 |
kW-mo/yr
|
$7.72 |
Electricity Fees | $12,884 | - |
|
- |
Natural Gas | $266,579 | 182,154 |
MMBtu
|
$1.46 |
TOTAL YEARLY COSTS | $1,040,086 | |||
RECOMMENDED SAVINGS* | $285,824 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $27,308 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $247,190 | $742,500 |
$229,500
4,500,000
kWh
|
$69,462
-
kW-mo/yr
|
$(-51,772.0)
-
MMBtu
|
|
02 | 2.7232: Replace existing hvac unit with high efficiency model | $19,620 | $43,782 |
$15,993
313,586
kWh
|
$3,627
-
kW-mo/yr
|
- | |
03 | 2.9112: Use solar heat to heat water | $10,324 | $48,514 | - | - |
$10,324
-
MMBtu
|
|
04 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $6,129 | $15,000 | - | - |
$6,129
-
MMBtu
|
|
05 | 2.3132: Recharge batteries on during off-peak demand periods | $1,559 | $1,827 | - |
$1,559
-
kW-mo/yr
|
- | |
06 | 2.2511: Insulate bare equipment | $1,002 | $1,484 |
$770
15,093
kWh
|
$232
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $285,824 | $853,107 |
$246,263
4,828,679
kWh
|
$74,880
-
kW-mo/yr
|
$(-35,319.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $27,308 | $60,609 |
$15,993
313,586
kWh
|
$5,186
-
kW-mo/yr
|
$6,129
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs