ITAC Assessment: MA0438
ITAC logo
ITAC Assessment: MA0438
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Rubber Seals
NAICS
n/a
SIC 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods
Sales Range $5
M
to 10
M
# of Employees 38
Plant Area 27,000
ft2
Annual Production 3,600,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $152,270 2,996,483
kWh
Electricity Demand $140,193 10,010
kW-mo/yr
Natural Gas $58,453 11,529
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,922 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,011 $6,075 $3,011
74,150
kWh
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,856 $4,925 $1,856
45,721
kWh
03 2.2611: Moderate cooling tower outlet temperature $1,055 $3,400 $1,055
26,084
kWh
TOTAL RECOMMENDED $5,922 $14,400 $5,922
145,955
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs