ITAC Assessment: TN0337
ITAC logo
ITAC Assessment: TN0337
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product CARBONATED BEVERAGES
NAICS
n/a
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area
n/a
Annual Production 3,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,656 1,347,304
kWh
LPG $26,139 3,683
MMBtu
Fuel Oil #6 $22,051 5,323
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,031 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,387

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Fuel Oil #6 Savings Administrative Changes Savings
01 2.2136: Install / repair insulation on steam lines $14,407 $2,574 - $6,528
-
MMBtu
$7,879
-
MMBtu
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $2,720 - - $1,369
-
MMBtu
$1,651
-
MMBtu
$(-300.0)
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,896 $1,110 $2,896
47,479
kWh
- - -
04 2.2135: Repair and eliminate steam leaks $771 $225 - $348
-
MMBtu
$423
-
MMBtu
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,271 - $2,271
37,222
kWh
- - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,144 - $1,144
18,757
kWh
- - -
07 2.4312: Improve lubrication practices $411 $600 $411
6,741
kWh
- - -
08 2.4221: Install compressor air intakes in coolest locations $411 $385 $411
6,741
kWh
- - -
TOTAL RECOMMENDED $25,031 $4,894 $7,133
116,940
kWh
$8,245
-
MMBtu
$9,953
-
MMBtu
$(-300.0)
TOTAL IMPLEMENTED $6,387 $1,335 $2,896
47,479
kWh
$1,717
-
MMBtu
$2,074
-
MMBtu
$(-300.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings Fuel Oil #6 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs