Assessment Year | 1988 |
---|---|
Principal Product | CARBONATED BEVERAGES |
NAICS |
n/a
|
SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
Sales Range | $10 M to 50M |
# of Employees | 60 |
Plant Area |
n/a
|
Annual Production | 3,000,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $81,656 | 1,347,304 |
kWh
|
$0.061 |
LPG | $26,139 | 3,683 |
MMBtu
|
$7.10 |
Fuel Oil #6 | $22,051 | 5,323 |
MMBtu
|
$4.14 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $25,031 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,387 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings | Fuel Oil #6 Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2136: Install / repair insulation on steam lines | $14,407 | $2,574 | - |
$6,528
-
MMBtu
|
$7,879
-
MMBtu
|
- | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,720 | - | - |
$1,369
-
MMBtu
|
$1,651
-
MMBtu
|
$(-300.0) | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,896 | $1,110 |
$2,896
47,479
kWh
|
- | - | - | |
04 | 2.2135: Repair and eliminate steam leaks | $771 | $225 | - |
$348
-
MMBtu
|
$423
-
MMBtu
|
- | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,271 | - |
$2,271
37,222
kWh
|
- | - | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,144 | - |
$1,144
18,757
kWh
|
- | - | - | |
07 | 2.4312: Improve lubrication practices | $411 | $600 |
$411
6,741
kWh
|
- | - | - | |
08 | 2.4221: Install compressor air intakes in coolest locations | $411 | $385 |
$411
6,741
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $25,031 | $4,894 |
$7,133
116,940
kWh
|
$8,245
-
MMBtu
|
$9,953
-
MMBtu
|
$(-300.0) | ||
TOTAL IMPLEMENTED | $6,387 | $1,335 |
$2,896
47,479
kWh
|
$1,717
-
MMBtu
|
$2,074
-
MMBtu
|
$(-300.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | LPG Savings | Fuel Oil #6 Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs